Skip to main content

Currently Skimming:


Pages 37-38

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 37...
... 37 C h a p t e r 7 Introduction A web-based information and guidance system for 46 geoconstruction technologies has been developed as part of the SHRP 2 R02 project. The information and guidance system contains an introduction to the geotechnical design process, catalog of technologies, selection system, and glossary.
From page 38...
... 38 judgment should be the final selection process. The selection process should include: construction cost, maintenance cost, design and QC issues, performance and safety (pavement smoothness, hazards caused by maintenance operations, potential failures)

Key Terms



This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.