Skip to main content

Currently Skimming:


Pages 47-48

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 47...
... 45 • "Use the right technology for the right application. For example, consider need and possibility to achieve various settlement/rigidity constraints and match service level to appropriate cost for application." • "Providing a sound and firm foundation for support of the wall; and providing proper drainage within the wall system and adjacent to the wall geometry." • "Performance depends on quality of construction and quality of retained backfill materials." • "Make sure the contractor is using the specified reinforced fill material and is constructing according to plans." • "By having a formal wall approval process we have limited the use of modular block wall systems and the deterioration of these facing elements due to deicing chemicals." • "The systems can last forever but must be designed and built correctly." • "Electrochemical property requirements for backfill material were not specified for one wall built in the late 70s.
From page 48...
... 46 • "None of our installations have reached an age where failure would be anticipated. To date, no significant performance issues have been identified." • "[ .

Key Terms



This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.