... 119 Abbreviated case studies may be found in chapter six. The following bridge sites (see Table F1)
From page 120...
... 120 CASE STUDY: SCOUR MONITORING OF THREE LONG ISLAND BRIDGES A partial bridge pier failure due to scour resulted in the investigation of the cause, the design of repairs, and the preparation of a plan of action. This event led to the development of a scour monitoring program that uses sonar scour monitors to ensure stability of the bridge and the safety of the traveling public.
From page 121...
... 121 The 2001 installation of sonar scour monitors at Robert Moses Causeway over Fire Island Inlet in Suffolk County, New York, is a long-term solution to the scour problems at that bridge. The bridge is a 326-m (1,068-ft)
From page 122...
... 122 installed, and the Long Island scour monitoring manual was revised to include this system (see Figure F6 and Appendix G)