... 76 APPENDIX C Summary of Survey Responses The following states submitted surveys. The states that reported the use of fixed scour monitors are in bold.
From page 77...
... 77 States that have not replied to date, but that are known to have used or currently have fixed scour monitoring installations include.
From page 78...
... 78 2.4 What innovations/advancements would be beneficial for you to consider using fixed scour monitoring instrumentation? AR -- W e are currently undergoing an in-house research project (see attach me nt)
From page 79...
... 79 CA (2.1) -- Toomes Creek, 99 CA (2.2)
From page 81...
... 81 VT -- 1966 WA -- 1929 3.8–3.9 Who owns/maintains the bridge?
From page 82...
... 82 FL -- 120 ft (District 2)
From page 83...
... 83 3.15 (Item 60/Item 113)
From page 84...
... 84 3.17 What is the foundation type? Piles = 37 Spread Footings = 22 Drilled Shafts = 1 Unknown = 1 Other = 1 3.18 Is the foundation depth known?
From page 86...
... 86 HI (1) -- 2/1/04; Q = 930 cfs; 2–5 yr; V = 2 fps IN -- 6/97, 1/99 KS -- 2/25/01 MD -- Hurricane Floyd (1999)
From page 88...
... 88 AK (2.12) -- $10,000 materials, $7,000 labor AK (2.13)
From page 89...
... 89 FL–D2 -- A co mb ination of inform ation taken fro m the routine inspections, scour evaluations, and the fact that the bridges considered scour critical.
From page 90...
... 90 5.9 Do the monitors have an automated alarm system (automatic alert that sends a signal)
From page 91...
... 91 IN -- USGS gage about 1 mile downstream of bridge. MD -- The water stage recorder and velocity meters are a part of the scour monitoring contract and are furnished by ETI Instrument Systems, Inc.
From page 92...
... 92 6.3 How often is the data collected and reviewed during emergency situations? Every 30 min = 4 Once hourly = 27 Daily = 2 Weekly = 0 Monthly = 0 Other = 23 (Responses include: during a flood, 5 min; every 15 min, twice daily, unknown, bi-weekly, as needed; as often as needed; DOT decision; all data/video are real time; objective is to document the effect of the ice cover on the scour process; ongoing through alarm system and staff; at engineers discretion; every 15 min.)
From page 93...
... 93 6.5 How is data downloaded or retrieved? (Check all that apply.)
From page 94...
... 94 6.10 How is the data used, and what outputs are generated (i.e., graphs, data reduction, reports, design, and/or analysis)
From page 95...
... 95 6.12 What is the scour rating of this bridge according to the FHWA National Bridge Scour Evaluation Program, FRA requirements for identification of scour critical bridges, or other systems? Low Risk = 5 Scour Susceptible = 2 Scour Critical = 39 U nknown Foundations = 2 Others = 22 6.13 Has an emergency Plan of Action, similar to that developed by FHWA, been established?
From page 96...
... 96 AR -- Sonar can be checked against portable, boat-m ounted unit. CA -- High stream flows quickly receeded.
From page 97...
... 97 7.3 Have any of the following interfered with the operation of or caused damage to the fixed monitors? ( Check all that apply.
From page 98...
... 98 7.7 Who repairs the scour monitoring system? Contractor = 24 In-House Staff = 23 Consultant = 7 Monitoring System Vendor = 9 USGS = 25 Other = 8 7.8 Who inspects the scour monitoring system?
From page 99...
... 99 HI (1) -- The m onitoring system s were well designed and ma nufactured by ETI.
From page 100...
... 100 8.5 Were there any additional problems or issues?
From page 101...
... 101 NYCDOT -- Safety assurance during construction of the new bridge TX -- Climbing the learning curve on fixed scour monitoring and evaluation feasibility. WA -- Been able to keep roadway open during rainy season.