... 69C H A P T E R 7 Development of Requests for ProposalsPhase 2 Process Once the ranked list of proposed research areas that had been prepared in the project's first phase was approved by the SHRP 2 committee, the research team was authorized to develop specific research plans based on these proposed areas of interest. During the project's second phase, the research team studied the best way to implement each research topic in terms of specific project descriptions that could be issued within the funding levels and time period allocated for this effort by the SHRP 2 program.
From page 70...
... 70potential technological developments with only marginal real capability improvements from being continued into Phase 2 funding. • Funding level: Proposed funding levels are given for each recommended project based on an evaluation of the level of technological development required, the complexity and effort for team members in team proposals, and the reporting and evaluation costs imposed on the project.
From page 71...
... 71undergone relocation. The project should include the field deployment of computerized utility data or maps for use in utility locating for design purposes and for damage prevention for excavation or construction projects.
From page 72...
... 72$1,200,000. A detailed budget covering all phases according to the requirements of the SHRP 2 Proposal Manual is required.
From page 73...
... 73Soil Pipe 2 in.
From page 74...
... 74contacts should be designed to build on the information collected in previous studies (for example, SHRP 2 Project R01 and SHRP 2 Project R15) rather than duplicate previous information-collection efforts.
From page 75...
... 75plans presented in the proposal but remain consistent with the proposal plans and schedule. Prototype refinement and testing cycles should be identified.
From page 76...
... 76education and training materials on the costs and benefits associated with the deployment of state-of-the-practice and advanced technologies for utility locating and characterization. Materials will include discussions on necessary equipment technician qualifications.
From page 77...
... 77Tasks TASK 1. Prepare an expanded technological development plan with more detailed development and evaluation milestones.
From page 78...
... 78Contract Period A 28-month contract period including review and final editing is anticipated. Project R01-P08: Test Facilities and Test Protocols for the Performance Classification of Utility Detection Technologies Objective This project will support the use, further development, or creation of test facilities for the independent assessment of utility locating technologies.
From page 79...
... 79on pipe materials that can be measured, the extent of pipe cleaning required, and the ability to incorporate the detection technology in conjunction with other pipe inspection systems.