From page 28...
... 15 C H A P T E R 3 Study Locations Study Location Selection Criteria and Process Location selection criteria were developed primarily to judge if a Barrier site and its potentially "equivalent" No Barrier site are indeed equivalent. The criteria were incorporated in a Preliminary Site Evaluation Form prepared by the researchers.
From page 29...
... 16 The originally selected California location was ATS-2, SR-99 in Bakersfield, CA. Before the measurements could be conducted, a roadway construction project was started at the ATS-2 location.
From page 30...
... 17 Most of the measurement points were within the highway right-of way, meaning that most of the distances to the community microphones were within approximately 100 ft of the center of the near travel lane. The exception was the SR-71 site where the more distant microphones were able to be set up approximately 400 ft from the center of the near travel lane.
From page 31...
... 18 Table 3. Acceptable candidate locations.
From page 32...
... 19 I-24, Murfreesboro, TN (Location BA-1) I-24 is an 8-lane freeway with dense-graded asphalt pavement that carries 78,000 vehicles per day with 14% trucks.
From page 33...
... 20 Figure 5 shows cross-sections at the Barrier and No Barrier sites. Figure 6 shows photographs of each site.
From page 34...
... 21 Figure 5. Cross-sections at the I-24 Barrier (top)
From page 35...
... 22 Figure 6. I-24 BarRef01 (top left)
From page 36...
... 23 Briley Parkway (SR-155) , Nashville, TN (Location BA-3)
From page 37...
... 24 The Briley Parkway ("Briley") noise measurements and traffic speed measurements began at 17:04 on August 14 and ended at 21:04.
From page 38...
... 25 Figure 9. Cross-sections at the Briley Parkway Barrier (top)
From page 39...
... 26 Figure 10. Briley BarRef01 (top left and right)
From page 40...
... 27 I-90, Rockford, IL (Location SID-1) I-90 is part of the Illinois Tollway system and is a six-lane freeway with dense-graded asphalt pavement.
From page 41...
... 28 Figure 12. I-90 microphone positions.
From page 42...
... 29 Figure 13. Cross-sections at the I-90 Barrier (top)
From page 43...
... 30 Figure 14. I-90 BarRef01 (top left)
From page 44...
... 31 SR-71, Chino Hills, CA (Location ATS-3) SR-71 is a six-lane freeway in Chino Hills, CA, with longitudinally grooved concrete pavement.
From page 45...
... 32 microphone, the ground between the highway noise source and BarCom03 would have included more pavement than for NoBarCom05 due to a merge lane; the close microphones were shifted south of where the merge lane ends)
From page 46...
... 33 Figure 17. Cross-sections at the SR-71 Barrier (top)
From page 47...
... 34 Figure 18. SR-71 BarRef01 (top left)
From page 48...
... 35 Figure 19. SR-71 BarRef01 Traffic speed (top left)
From page 49...
... 36 Figure 20. No Barrier NoBarCom05 and NoBarCom06 (left)
From page 50...
... 37 Figure 21. MD-5 microphone positions.
From page 51...
... 38 Figure 22. Cross-sections at the MD-5 Barrier (top)
From page 52...
... 39 Figure 23. MD-5 BarRef01 (top left)
From page 53...
... 40 Summary of Microphone Positions For reference, Table 9 summarizes the microphone heights and distances from the road at each location. Table 9.