From page 50...
... 48 APPENDIX A Survey Questionnaire and Consolidated Responses (McCuen and Pittenger 2015) Survey: ACRP Synthesis 09-07: BIM for Airports [The survey used "skip logic" (all respondents did not receive all questions)
From page 51...
... 49 Does your organization have a BIM champion in upper management? Value Percent Count Airport AEC Yes 75.0 5 4 No 16.7 2 0 Other: There is awareness, but not a specific BIM champion 8.3 1 0 Total Respondents 8 4 Does your organization have a written implementation plan for BIM in place?
From page 52...
... 50 What method was used to develop your facility/facilities in BIM? (Check all that apply.)
From page 53...
... 51 To combine the three analyses, weighted average based on standard utility theory was used (West and Riggs 1986)
From page 54...
... 52 What level of BIM implementation do you expect your organization will achieve in the near future? Value Percent Count Airport AEC Light implementation (less than 15% of projects using BIM)
From page 55...
... 53 How does your organization currently use BIM? (Check all that apply.)
From page 56...
... 54 Which of the following BIM uses does your organization currently utilize? (Check all that apply.)
From page 57...
... 55 Space Management / Tracking Count Response 2 2 1 4 Digital Fabrication Count Response 1 11 1 13 3 3 Structural Analysis Count Response 1 1 1 2 1 4 Disaster Planning Count Response 1 4 3D Control and Planning Count Response 1 12 3 2 1 3 Lighting Analysis Count Response 1 4 2 5 Record Modeling Count Response 1 1 1 10 1 14 1 2 2 3 1 6 3D Design Coordination Count Response 2 1 4 2 1 3 1 4 Mechanical Analysis Count Response 1 3 1 4 Other Engineering Analysis Count Response 1 4 1 7 Design Reviews Count Response 1 1 3 2 1 8 1 9 LEED Evaluation Count Response 1 15 1 2 Code Validation Count Response 1 2 Phase Planning (4D Modeling) Count Response 1 10 1 12 4 2 1 5 Programming Count Response 1 1 1 2 1 4 1 8 1 9 Cost Estimation Count Response 3 2 1 4 1 6 Site Analysis Count Response 2 1 1 2 1 3 1 4 1 8 Existing Conditions Modeling Count Response 4 1 1 2 1 3 1 9
From page 58...
... 56 Summary Table: BIM Use Implementation Sequence Profiles for Responding Airports Phase BIM Use BIM Activity Level Very High High Medium Low A L L Existing Conditions Modeling 1 2 3 1 Future -- N O N E C U R R E N T L Y , B U T E X P E C T F U L L I M P L E M E N T A T IO N I N F U T U R E Cost Estimation 2 -- Future 4 Future Future P L A N , D E S IG N a nd /o r C O N S T R U C T Phase Planning (4D Modeling) 2 8 -- 2 1 Future Design Reviews 2 7 -- 2 -- -- Site Analysis 3 -- 4 -- 1 -- Programming 2 6 -- 4 1 -- Code Validation Future Future -- -- Future -- LEED Evaluation Future -- -- -- 1 Future Engineering Analysis (structural, lighting, energy…)
From page 59...
... 57 Which of the following opportunities in BIM do you expect your organization will require on projects in the future? (Check all that apply.
From page 60...
... 58 ROI Airport Results Summary Table: BIM Activity Level (from Figure 2) versus BIM Value BIM Activity Level Track Costs, Calculate ROI Design and Construction Phase Operations and Maintenance Phase # of Respondents BIM has added value # of Respondents BIM has added value Very High 100% 2 100% 1 Yes High 60% 5 100% 2 50% Medium 67% 3 100% 1 Yes Low 0% 2 50% 0 Have all the initial costs associated with BIM implementation been accounted for?
From page 61...
... 59 What benefits do you believe are realized by your organization in using BIM during design and construction? (Check all that apply.)
From page 62...
... 60 What benefits do you believe are realized by your organization in using BIM during operations? (Check all that apply.)
From page 63...
... 61 Has the use of BIM added value to the operations and maintenance (O&M) of your organization's facility/facilities?
From page 64...
... 62 Do you use energy analysis (energy modeling) for tenants?
From page 65...
... 63 Is your organization's asset management system integrated with BIM software for data exchange? Value Percent Count - Airport Yes 0.0 0 No 100.0 2 Total Airports 2 Is your organization linking BIM with a geographic information system (GIS)
From page 66...
... 64 For which of the following asset management activities is your organization utilizing the BIM data? Value Percent Count - Airport Integrated decision making 50.0 1 Life cycle analysis 50.0 1 Real property inventory 50.0 1 Other: Transfer of data from Construction to Operations 50.0 1 Total Airports 2 Does your organization utilize metrics to assess the value of BIM utilization for asset management?