... 25 Some agencies refer to the manufacturers' specifications and certifications for all hardware items, whereas others identify each component separately and list the appropriate ASTM or other standard to which the item must comply. Manufacturer's Representative Most agency specifications or special provisions require that a representative with thorough knowledge of the system being installed be identified for the project and be acceptable to the project engineer.
From page 25...
... 26 Geotechnical Information Most DOTs now recognize the importance of designing end anchor foundations and line post footings for on-site soil conditions. Many state agencies provide limited soil data to the contractor, usually with a caveat that it may not be representative of all soil conditions on the project.
From page 26...
... 27 primarily resulting from the lateral placement of the cable on median slopes. The foundation problems appear to have been addressed.