From page 31...
... 24 Runway Protection Zones (RPZs) Risk Assessment Tool Users' Guide it to both accelerated stop distance available (ASDA)
From page 32...
... Figure 4.4. Editing properties of a runway.
From page 33...
... 26 Runway Protection Zones (RPZs) Risk Assessment Tool Users' Guide runway declared distances could be similarly edited.
From page 34...
... Getting Started with RPZ_RAT 27 Question: Assume tunneling a road passing through an RPZ is the only viable option to reduce risk and funding is sufficient only to tunnel a portion of the road, where should the road be tunneled? Answer: Start with areas of the road colored with the darkest shading.
From page 35...
... 28 Runway Protection Zones (RPZs) Risk Assessment Tool Users' Guide A user is not limited to analyzing what is seen on the tool map.