Skip to main content

Currently Skimming:


Pages 277-339

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 277...
... NCHRP 3-78b: Final Project Report April 2016 13 APPENDIX F: DETAILED FIELD STUDY RESULTS 277
From page 278...
... NCHRP 3-78b: Final Project Report April 2016 This page intentially left blanks 278
From page 279...
... Guidelines for the Application of Crossing Solutions at Roundabouts and Channelized Turn Lanes for Pedestrians with Vision Disabilities NCHRP 3‐78b SITE SUMMARIES – NCHRP 03‐78B – APPENDIX F 279
From page 280...
... 280 CTL - Tucson, Arizona – Grant and Oracle Road (NE approach) Studied April 2014 Factor Rating Description Noise OK Low volume in turn lane, few trucks, no other sound sources Visibility Concerning Issue because of cabinets, and because crosswalk is too close to downstream end Lane Utilization n/a n/a because approach is single lane Exhibit 1: Traffic Volumes Exhibit 2: Special Feature Raised Crosswalk SW Quadrant Site Background This site was studied as part of trip evaluating four different channelized turn lanes in Tucson, AZ.
From page 281...
... 281 CTL - Tucson, Arizona – Grant and Oracle Road (NE approach) Studied April 2014 Exhibit 3: O&M Estimated Intervention and Risky Events O&M and Observer Interventions O&M Estimated Interventions O&M Estimated Risky Events Count Rate Count Rate Tucson, AZ NE n=36 0 0% 2 5.56% Exhibit 4: Delay Values Average Delay (sec.)
From page 282...
... CTL - Tucson, Arizona – Grant and Oracle Road (SW approach) Studied April 2014 Factor Rating Description Noise OK However, yield utilization suggests an issue Visibility OK Better than NE approach; two-stage movement Lane Utilization n/a n/a because approach is single lane Exhibit 1: Traffic Volumes Exhibit 2: Special Feature Raised Crosswalk SW Quadrant 282 Site Background This site was studied as part of trip evaluating four different channelized turn lanes in Tucson, AZ.
From page 283...
... 283 CTL - Tucson, Arizona – Grant and Oracle Road (SW approach) Studied April 2014 Exhibit 3: O&M Estimated Intervention and Risky Events O&M and Observer Interventions O&M Estimated Interventions O&M Estimated Risky Events Count Rate Count Rate Tucson, AZ SW n=45 1 2.17% 4 8.7% Exhibit 4: Delay Values Average Delay (sec.)
From page 284...
... 284 CTL - Tucson, Arizona – Sabino Canyon Road and Tanque Verde Road Studied April 2014 Factor Rating Description Noise OK Easier to hear than Oracle & Grant, bigger island seemed helpful despite high traffic Visibility OK Lane Utilization n/a n/a because approach is single lane December 10 – 14, 2014 Exhibit 1: Traffic Volume Exhibit 2: Special Feature Site Background This site was studied as part of trip evaluating four different channelized turn lanes in Tucson, AZ. The studied CTLs featured a deceleration lane and an acceleration lanes.
From page 285...
... 285 CTL - Tucson, Arizona – Sabino Canyon Road and Tanque Verde Studied April 2014 Exhibit 3: O&M Estimated Intervention and Risky Events O&M and Observer Interventions O&M Estimated Interventions O&M Estimated Risky Events Count Rate Count Rate Tucson, AZ NE n=37 0 0% 3 8.11% Exhibit 4: Delay Values Average Delay (sec.) Count Ave.
From page 286...
... 286 CTL - Tucson, Arizona – Wilmot Road and Speedway Boulevard Studied April 2014 Exhibit 1: Traffic Volume Factor Rating Description Noise OK Visibility OK Lane Utilization n/a Exhibit 2: Special Feature Site Background This site was studied as part of trip evaluating four different channelized turn lanes in Tucson, AZ. The studied CTLs featured a deceleration lane but no acceleration lanes.
From page 287...
... 287 CTL - Tucson, Arizona – Wilmot Road and Speedway Boulevard Studied April 2014 Exhibit 3: O&M Estimated Intervention and Risky Events O&M and Observer Interventions O&M Estimated Interventions O&M Estimated Risky Events Count Rate Count Rate Tucson, AZ NW n=46 1 2.17% 1 2.17% Exhibit 4: Delay Values Average Delay (sec.) Count Ave.
From page 288...
... 288 CTL - Boulder, Colorado – 28th Street and Canyon Boulevard Studied July 2014 Exhibit 1: Traffic Volume Exhibit 2: Special Feature Factor Rating Description Noise OK Doesn't seem louder than other CTLs within Boulder Visibility Concerning Crosswalk close to downstream end creating single-stage maneuver Lane n/a Utilization n/a because approach is single lane Site Background This channelized turn lane (CTL) was studied as part of trip evaluating six CTLs in the Boulder, CO area.
From page 289...
... 289 CTL - Boulder, Colorado – 28th Street and Canyon Boulevard Studied July 2014 Exhibit 3: O&M Estimated Intervention and Risky Events O&M and Observer Interventions O&M Estimated Interventions O&M Estimated Risky Events Count Rate Count Rate Boulder, CO SW n=48 4 8.33% 4 8.33% Exhibit 4: Delay Values Average Delay (sec.) Count Ave.
From page 290...
... 290 CTL - Boulder, Colorado – 28th Street and Pearl Street (NW approach) Studied July 2014 Factor Rating Description Noise OK Visibility OK Sufficient storage downstream Lane Utilization n/a n/a because approach is single lane Exhibit 1: Traffic Volumes Exhibit 2: Special Feature Site Background The first CTL at this intersection is at the northeast quadrant of the intersection of 28th Street and Pearl Street.
From page 291...
... 291 CTL - Boulder, Colorado – 28th Street and Pearl Street (NW approach) Studied July 2014 Exhibit 3: O&M Estimated Intervention and Risky Events O&M and Observer Interventions O&M Estimated Interventions O&M Estimated Risky Events Count Rate Count Rate Boulder, CO NW n=58 1 1.72% 0 0% Exhibit 4: Delay Values Average Delay (sec.)
From page 292...
... 292 CTL - Boulder, Colorado – 28th Street and Pearl Street (NE approach) Studied July 2014 Exhibit 1: Traffic Volumes Exhibit 2: Special Feature Site Background The first CTL at this intersection is at the northeast quadrant of the intersection of 28th Street and Pearl Street.
From page 293...
... 293 CTL - Boulder, Colorado – 28th Street and Pearl Street (NE approach) Studied July 2014 Exhibit 3: O&M Estimated Intervention and Risky Events O&M and Observer Interventions O&M Estimated Interventions O&M Estimated Risky Events Count Rate Count Rate Boulder, CO NE n=59 5 8.47% 7 11.86% Exhibit 4: Delay Values Average Delay (sec.)
From page 294...
... 294 CTL - Boulder, Colorado – Foothills Parkway and Arapahoe Avenue Studied July 2014 Exhibit 1: Traffic Volume Exhibit 2: Special Feature Site Background This channelized turn lane (CTL) was studied as part of trip evaluating six CTLs in the Boulder, CO area.
From page 295...
... 295 CTL - Boulder, Colorado – Foothills Parkway and Arapahoe Studied July 2014 Exhibit 3: O&M Estimated Intervention and Risky Events O&M and Observer Interventions O&M Estimated Interventions O&M Estimated Risky Events Count Rate Count Rate Boulder, CO SW n=60 0 0% 2 3.33% Exhibit 4: Delay Values Average Delay (sec.) Count Ave.
From page 296...
... 296 CTL - Boulder, Colorado – Foothills and Baseline Road (NE approach) Studied July 2014 Exhibit 1: Traffic Volumes Exhibit 2: Special Feature Site Background This site features two channelized turn lanes (CTLs)
From page 297...
... 297 CTL - Boulder, Colorado – Foothills and Baseline Road (NE approach) Studied July 2014 Exhibit 3: O&M Estimated Intervention and Risky Events O&M and Observer Interventions O&M Estimated Interventions O&M Estimated Risky Events Count Rate Count Rate Boulder, CO NE, no TRMT n=59 0 0% 1 1.69% Exhibit 4: Delay Values Average Delay (sec.)
From page 298...
... 298 CTL - Boulder, Colorado – Foothills and Baseline Road (SW approach) Studied July 2014 Exhibit 1: Traffic Volumes Exhibit 2: Special Feature Factor Rating Description Noise OK Visibility OK Lane Utilization n/a n/a because approach is single lane Site Background This site features two channelized turn lanes (CTLs)
From page 299...
... 299 CTL - Boulder, Colorado – Foothills and Baseline Road (SW approach) Studied July 2014 Exhibit 3: O&M Estimated Intervention and Risky Events O&M and Observer Interventions O&M Estimated Interventions O&M Estimated Risky Events Count Rate Count Rate Boulder, CO SW, Sound Strip n=60 0 0% 2 3.33% Exhibit 4: Delay Values Average Delay (sec.)
From page 300...
... 300 CTL - Cary, North Carolina – Kildaire Farm Road and Tyron Road Studied November 2014 Exhibit 1: Traffic Volume Exhibit 2: Special Feature Site Background This channelized turn lane is at the southwest quadrant of the intersection of Kildaire Farm Road and Tyron Road in Cary, North Carolina. It features a deceleration lane, but no acceleration lane, and no pedestrian signage at the crosswalk.
From page 301...
... 301 CTL - Cary, North Carolina – Kildaire Farm Road and Tyron Road Studied November 2014 Exhibit 3: O&M Estimated Intervention and Risky Events O&M and Observer Interventions O&M Estimated Interventions O&M Estimated Risky Events Count Rate Count Rate Cary, NC SW n=41 2 4.88% 5 12.20% Exhibit 4: Delay Values Average Delay (sec.) Count Ave.
From page 302...
... 302 CTL - Greenbelt, Maryland – Kenilworth Avenue and East-West Studied September 2014 Factor Rating Description Noise Concerning High noise Visibility Concerning Not ideal visibility Lane Utilization n/a n/a because approach is single lane Exhibit 1: Traffic Volume Exhibit 2: Special Feature Site Background This channelized turn lane (CTL) is at northwest quadrant of the intersection of Kenilworth Avenue and West Highway Street in Greenbelt, Maryland.
From page 303...
... 303 CTL - Greenbelt, Maryland – Kenilworth Avenue and East-West Studied September 2014 Exhibit 3: O&M Estimated Intervention and Risky Events O&M and Observer Interventions O&M Estimated Interventions O&M Estimated Risky Events Count Rate Count Rate Greenbelt MD NW n=48 5 10.42% 6 12.50% Exhibit 4: Delay Values Average Delay (sec.) Count Ave.
From page 304...
... 304 RBT - Ann Arbor, Michigan – Ellsworth and State Road (Entry) Studied October 2014 Exhibit 1: Traffic Volume Exhibit 2: Special Feature Site Background This two-lane roundabout site is at State St.
From page 305...
... 305 RBT - Ann Arbor, Michigan – Ellsworth and State Road (Entry) Studied October 2014 Exhibit 3: O&M Estimated Intervention and Risky Events O&M and Observer Interventions O&M Estimated Interventions O&M Estimated Risky Events Count Rate Count Rate Ann Arbor, MI West Entry n=32 0 0% 0 0% Exhibit 4: Delay Values Average Delay (sec.)
From page 306...
... 306 RBT - Ann Arbor, Michigan – Ellsworth and State Road (Exit) Studied October 2014 Exhibit 1: Traf fic Volume Factor Rating Description Noise Concerning High exiting traffic, some trucks, lots of honking Visibility Concerning Right turn challenge close to crosswalk (despite offset)
From page 307...
... 307 RBT - Ann Arbor, Michigan – Ellsworth and State Road (Exit) Studied October 2014 Exhibit 3: O&M Estimated Intervention and Risky Events O&M and Observer Interventions O&M Estimated Interventions O&M Estimated Risky Events Count Rate Count Rate Ann Arbor, MI West Exit n=32 1 3.13% 6 18.75% Exhibit 4: Delay Values Average Delay (sec.)
From page 308...
... 308 RBT - Ann Arbor, Michigan – Nixon Road and Huron Parkway (Entry) Studied October 2014 Exhibit 1: Traffic Volume Exhibit 2: Special Feature Site Background This single-lane site is at Huron Parkway and Nixon Road.
From page 309...
... 309 RBT - Ann Arbor, Michigan – Nixon Road and Huron Parkway (Entry) Studied October 2014 Exhibit 3: O&M Estimated Intervention and Risky Events O&M and Observer Interventions O&M Estimated Interventions O&M Estimated Risky Events Count Rate Count Rate Ann Arbor, MI South Entry n=40 0 0% 2 5% Exhibit 4: Delay Values Average Delay (sec.)
From page 310...
... 310 RBT - Ann Arbor, Michigan – Nixon Road and Huron Parkway (Exit) Studied October 2014 Exhibit 1: Traffic Volume Exhibit 2: Special Feature Site Background This single-lane site is at Huron Parkway and Nixon Road.
From page 311...
... 311 RBT - Ann Arbor, Michigan – Nixon Road and Huron Parkway (Exit) Studied October 2014 Exhibit 3: O&M Estimated Intervention and Risky Events O&M and Observer Interventions O&M Estimated Interventions O&M Estimated Risky Events Count Rate Count Rate Ann Arbor, MI South Exit n=40 0 0% 2 5% Exhibit 4: Delay Values Average Delay (sec.)
From page 312...
... 312 RBT - Cary, North Carolina – Old Apex Road and West Chatham (Entry) Studied November 2014 Exhibit 1: Traffic Volume Exhibit 2: Special Feature Site Background This single-lane roundabout is at the intersection of Old Apex Road and West Chatham Street in Cary, North Carolina.
From page 313...
... 313 RBT - Cary, North Carolina – Old Apex Road and West Chatham (Entry) Studied November 2014 Exhibit 3: O&M Estimated Intervention and Risky Events O&M and Observer Interventions O&M Estimated Interventions O&M Estimated Risky Events Count Rate Count Rate Cary, NC West Entry n=40 1 2.50% 3 7.50% Exhibit 4: Delay Values Average Delay (sec.)
From page 314...
... 314 RBT - Cary, North Carolina – Old Apex Road and West Chatham (Exit) Studied November 2014 Exhibit 1: Traffic Volume Exhibit 2: Special Feature Site Background This single-lane roundabout is at the intersection of Old Apex Road and West Chatham Street in Cary, North Carolina.
From page 315...
... 315 RBT - Cary, North Carolina – Old Apex Road and West Chatham (Exit) Studied November 2014 Exhibit 3: O&M Estimated Intervention and Risky Events O&M and Observer Interventions O&M Estimated Interventions O&M Estimated Risky Events Count Rate Count Rate Cary, NC West Exit n=41 2 4.88% 2 4.88% Exhibit 4: Delay Values Average Delay (sec.)
From page 316...
... 316 RBT - Greenbelt, Maryland – Cherrywood and Greenbelt (Entry) Studied September 2014 Exhibit 1: Traffic Volume Exhibit 2: Special Feature Factor Rating Description Noise Concerning Exiting traffic made it difficult to hear entry Visibility OK Lane Utilization n/a n/a because approach is single lane Site Background This roundabout is at the intersection of Cherrywood Lane and Greenbelt Metro Drive in Greenbelt, Maryland.
From page 317...
... 317 RBT - Greenbelt, Maryland – Cherrywood and Greenbelt (Entry) Studied September 2014 Exhibit 3: O&M Estimated Intervention and Risky Events O&M and Observer Interventions O&M Estimated Interventions O&M Estimated Risky Events Count Rate Count Rate Greenbelt, MD West Entry n=48 1 2.08% 1 2.08% Exhibit 4: Delay Values Average Delay (sec.)
From page 318...
... 318 RBT - Greenbelt, Maryland – Cherrywood and Greenbelt (Exit) Studied September 2014 Exhibit 1: Traffic Volume Exhibit 2: Special Feature Site Background This roundabout is at the intersection of Cherrywood Lane and Greenbelt Metro Drive in Greenbelt, Maryland.
From page 319...
... 319 RBT - Greenbelt, Maryland – Cherrywood and Greenbelt (Exit) Studied September 2014 Exhibit 3: O&M Estimated Intervention and Risky Events O&M and Observer Interventions O&M Estimated Interventions O&M Estimated Risky Events Count Rate Count Rate Greenbelt, MD West Exit n=50 2 4.00% 7 14% Exhibit 4: Delay Values Average Delay (sec.)
From page 320...
... 320 RBT - Hilliard, Ohio – Cemetery Road and Main Street (W Entry) Studied May 2014 Exhibit 1: Traffic Volumes Exhibit 2: Special Feature Site Background This roundabout has two‐lane entries and exits at all approaches and is outfitted with in‐road yield‐to‐pedestrian warning signs.
From page 321...
... 321 RBT - Hilliard, Ohio – Cemetery Road and Main Street (W Entry) Studied May 2014 Exhibit 3: O&M Estimated Intervention and Risky Events O&M and Observer Interventions O&M Estimated Interventions O&M Estimated Risky Events Count Rate Count Rate Hilliard, OH West Entry n=53 1 1.9% 13 25% Exhibit 4: Delay Values Average Delay (sec.)
From page 322...
... 322 RBT - Hilliard, Ohio – Cemetery Road and Main Street (W Exit) Studied May 2014 Exhibit 1: Traffic Volumes Exhibit 2: Special Feature Site Background This roundabout has two‐lane entries and exits at all approaches and is outfitted with in‐road yield‐to‐pedestrian warning signs.
From page 323...
... 323 RBT - Hilliard, Ohio – Cemetery Road and Main Street (W Exit) Studied May 2014 Exhibit 3: O&M Estimated Intervention and Risky Events O&M and Observer Interventions O&M Estimated Interventions O&M Estimated Risky Events Count Rate Count Rate Hilliard, OH West Exit n=56 8 14% 6 11% Exhibit 4: Delay Values Average Delay (sec.)
From page 324...
... 324 RBT - Hilliard, Ohio – Cemetery Road and Main Street (E Entry) Studied May 2014 Exhibit 1: Traffic Volumes Exhibit 2: Special Feature Site Background This roundabout has two‐lane entries and exits at all approaches and is outfitted with in‐road yield‐to‐pedestrian warning signs.
From page 325...
... 325 RBT - Hilliard, Ohio – Cemetery Road and Main Street (E Entry) Studied May 2014 Exhibit 3: O&M Estimated Intervention and Risky Events O&M and Observer Interventions O&M Estimated Interventions O&M Estimated Risky Events Count Rate Count Rate Hilliard, OH East Entry n=60 1 1.7% 7 12% Exhibit 4: Delay Values Average Delay (sec.)
From page 326...
... 326 RBT - Hilliard, Ohio – Cemetery Road and Main Street (E Exit) Studied May 2014 Exhibit 1: Traffic Volumes Exhibit 2: Special Feature Site Background This roundabout has two‐lane entries and exits at all approaches and is outfitted with in‐road yield‐to‐pedestrian warning signs.
From page 327...
... 327 RBT - Hilliard, Ohio – Cemetery Road and Main Street (E Exit) Studied May 2014 Exhibit 3: O&M Estimated Intervention and Risky Events O&M and Observer Interventions O&M Estimated Interventions O&M Estimated Risky Events Count Rate Count Rate Hilliard, OH East Exit n=60 4 6.7% 7 12% Exhibit 4: Delay Values Average Delay (sec.)
From page 328...
... 328 RBT - Novi, Michigan – Maple Road and Farmington Road (S Entry) Studied August 2014 Exhibit 1: Traffic Volumes Exhibit 2: Special Feature Site Background This multi-lane roundabout is at Maple Road and Farmington Road.
From page 329...
... 329 RBT - Novi, Michigan – Maple Road and Farmington Road (S Entry) Studied August 2014 Exhibit 3: O&M Estimated Intervention and Risky Events O&M and Observer Interventions O&M Estimated Interventions O&M Estimated Risky Events Count Rate Count Rate Novi, MI South Entry n=36 0 0% 1 2.78% Exhibit 4: Delay Values Average Delay (sec.)
From page 330...
... 330 RBT - Novi, Michigan – Maple Road and Farmington Road (N Exit) Studied August 2014 Exhibit 1: Traffic Volumes Exhibit 2: Special Feature Site Background This multi-lane roundabout is at Maple Road and Farmington Road.
From page 331...
... 331 RBT - Novi, Michigan – Maple Road and Farmington Road (N Exit) Studied August 2014 Exhibit 3: O&M Estimated Intervention and Risky Events O&M and Observer Interventions O&M Estimated Interventions O&M Estimated Risky Events Count Rate Count Rate Novi, MI North Exit n=42 3 7.14% 7 16.67% Exhibit 4: Delay Values Average Delay (sec.)
From page 332...
... 332 RBT - Novi, Michigan – Maple Road and Farmington Road (E Entry) Studied August 2014 Exhibit 1: Traffic Volumes Exhibit 2: Special Feature Site Background This multi-lane roundabout is at Maple Road and Farmington Road.
From page 333...
... 333 RBT - Novi, Michigan – Maple Road and Farmington Road (E Entry) Studied August 2014 Exhibit 3: O&M Estimated Intervention and Risky Events O&M and Observer Interventions O&M Estimated Interventions O&M Estimated Risky Events Count Rate Count Rate Novi, MI East Entry n=31 0 0% 2 6.45% Exhibit 4: Delay Values Average Delay (sec.)
From page 334...
... 334 RBT - Novi, Michigan – Maple Road and Farmington Road (E Exit) Studied August 2014 Exhibit 1: Traffic Volumes Exhibit 2: Special Feature Site Background This multi-lane roundabout is at Maple Road and Farmington Road.
From page 335...
... 335 RBT - Novi, Michigan – Maple Road and Farmington Road (E Exit) Studied August 2014 Exhibit 3: O&M Estimated Intervention and Risky Events O&M and Observer Interventions O&M Estimated Interventions O&M Estimated Risky Events Count Rate Count Rate Novi, MI East Exit n=32 0 0% 4 12.50% Exhibit 4: Delay Values Average Delay (sec.)
From page 336...
... 336 14 REFERENCES American Association of State Highway and Transportation Officials. A Policy on Geometric Design of Highways and Streets, 6th Edition.
From page 337...
... 337 Guth, D., D Ashmead, R
From page 338...
... 338 NIH National Institutes of Health, NIH. NIH/NEI Bioengineering Research Partnership Grant R01 EY12894-03, 2010.
From page 339...
... 339 Schroeder, Bastian; Hughes, Ronald; Rouphail, Nagui; Cunningham, Christopher; Salamati, Katy; Long, Richard; Guth, David; Emerson, Robert Wall; Kim, Dae; Barlow, Janet; Bentzen, Billie Louise; Rodegerdts, Lee; Myers, Ed. Crossing Solutions at Roundabouts and Channelized Turn Lanes for Pedestrians with Vision Disabilities.

Key Terms



This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.