Skip to main content

Currently Skimming:


Pages 1-12

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 2...
... PHASE In accord four sites Caltrans located a posted sp traffic (A dense gra of 106.6 site is rel in. (15cm however, photogra in the ea mostly cl I – NORTH ance with th in Northern source map long Califo eed limit is ADT)
From page 3...
... F Rather t identified Californi previous lane inter shown in mph for identified portland (OGAC) The first is shown level of 1 A5, the a site, the g about 1ft shoulder array wa 2013, wh skies.
From page 4...
... Figure A3: A Figur Loca erial view of e A4: Photo tion of Arra the I-505 i graph of ne y  A4 n the vicinity wer OGAC p of the sout avement at hbound 505 site 505 SB SB1 site 1
From page 5...
... The seco pavemen of this pa SB2 appe installed for the 2f array wa performe from 41° Figure A nd site in th t at this site vement is sh ars to have on 505 SB2 t (0.6m) dif s stationed d in the mor to 55°F, an 5: I-505 so e southboun was older O own in Fig more positiv in Figure A ference in el ; the array ning to earl d the wind w uthbound si d direction GAC and p ure A6.
From page 6...
... Figure A OGAC pa The third PCC, as Figu 7: Photogr vement measureme shown in th re A6: Photo aph of the nt location w e photograp graph of ol array instal as in the n h of Figure A6 der OGAC p led on I-50 orthbound d A8. The O avement at 5 southbou irection whe BSI level f site 505 SB nd site 505 re the pave or this pave 2 SB2 with ment was gr ment was older ound 103.4
From page 7...
... dBA. Tw Decembe short due northbou northbou are show sites, mo elevation compared the late a wind was midaftern was calm o sets of r 20th and o to darknes nd to allow nd (NB)
From page 8...
... Figure A pavemen Figure A pavemen 9: Photogr t 10: Photog t aph of arr raph of ar ay installed ray installe A8 at I-505 d at I-505 northbound northbound site 505 N site 505 N B1a with B1b with PCC PCC
From page 9...
... PHASE The mea vicinity Virginia. selected in the ar freeway operating the area, was 5 m volumes to the int measured The tem measurem Figure A F The seco 73/I-74 c informati measure the Elkin sufficient addition II – NORTH surements s of the town In this regi as it was kn ea.
From page 10...
... with crui downstre range du NC14)
From page 11...
...   Figure A posted sp 13: Beamfo eed of 65 mp Si Si Si Si Figu rming array h te NC1 te NC3 te NC5 te NC7 re A14: Pav installed ement phot A11   at Site NC1 ographs for 2 I-73/74 w S S S S Sites NC1 th ith a slight ite NC2 ite NC4 ite NC6 ite NC8 rough NC8 downhill a nd a
From page 12...
... Si Si Si Si Figu te NC9 te NC11 te NC13 te NC15 re A15: Pavement photo A12 graphs for Sites NC9 th Site NC10 Site NC12 Site NC14 Site NC16 rough NC16

Key Terms



This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.