Skip to main content

Currently Skimming:


Pages 55-57

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 55...
... 55 Project Mix Design Information Appendix A provides detailed information about the mix design and actual mixture volumetric properties obtained from extraction and recovery of plant produced mixtures for projects included in this study. Table A1.1 describes four new overlay paving projects that were constructed in 2011 and 2012; these projects are designated as MT I-15, TN SR 125, IA US 34, and LA US 61.
From page 56...
... 56 (a) Wet Freeze Zone Project MD 925 MO Hall St.
From page 57...
... 57 (c) Dry Freeze Zone Project WA I-90 WA SR 12 CO I-70 Sieve Size (mm)

Key Terms



This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.