Skip to main content

Currently Skimming:


Pages 68-69

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 68...
... 66 ACRONYMS AND ABBREVIATIONS A+B cost-plus-time A+C+D cost-plus-qualifications-plus work plan ACM alternative contracting method ATC alternative technical concept Caltrans California Department of Transportation CDOT Colorado Department of Transportation CEI construction engineering and inspection CM/GC construction manager/general contractor CQI construction quality index D-B design-build D-B-B design-bid-build D-B-F design-build-finance D-B-F-M design-build-finance-maintain DQI design quality index EIS Environmental Impact Statement FDOT Florida Department of Transportation FTC Florida Transportation Commission GDOT Georgia Department of Transportation GEC general engineering consultant LRTP long-range transportation plan MnDOT Minnesota Department of Transportation MoDOT Missouri Department of Transportation MPO metropolitan planning organization NBI National Bridge Inventory NCDOT North Carolina Department of Transportation NYSDOT New York State Department of Transportation
From page 69...
... 67 OBDP Oregon Bridge Delivery Partners ODOT Oregon Department of Transportation OTIA III Oregon Transportation Investment Act III P3 public-private partnership RFP request for proposals S&S (Missouri) Safe and Sound STIP state transportation improvement program TIP transportation improvement program UDOT Utah Department of Transportation WSDOT Washington State Department of Transportation

Key Terms



This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.