... Summary of DOT Project Delivery Guidance Review The research team reviewed 13 documents related to project delivery as a part of its initial research effort. This includes the applicable policy, procedure, and guidance documents from 12 state DOTs.
From page 89...
... 10. Colorado DOT Project Delivery Selection Matrix This document provides a formal approach for selecting project delivery methods for highway projects.
From page 90...
... Funding allocations are mostly controlled by transportation agencies with some local stakeholder involvement and the types of projects have principally been for rehabilitation of highways and bridges. The following is a summary of survey findings: • Responding transportation agencies indicated that 50% of project delivery responsibilities are divided amongst functional units or divisions in DOTs and transportation agencies, while another 40% indicated that project delivery responsibilities resided with a Program/ Project Management unit or division.
From page 91...
... Nevada DOT Project Management Guidelines 2nd Edition Working Draft 2010 Possible delivery methods include the following: 1. Design-Bid-Build 2.
From page 92...
... Colorado DOT CDOT Project Development Manual January 31, 2013 1. Phase I: Pre-Project Budget 2.
From page 93...
... Only 10% of responding agencies indicated that they had sole control over project funding. • Respondents indicated the following as the largest challenges to project delivery in order of priority: – Funding shortfall or underfunded programs – Schedule pressures – Pre-construction scope creep – Construction scope creep – Managing competing regional transportation priorities – Project programming – Satisfying regional partner or stakeholder interests • Approximately two-thirds (66.7%)
From page 94...
... From this information, the research team has drawn the following conclusions: • DOTs use a variety of different project delivery phases and milestones. These can be categorized into four generic phases having a set of common activities: – Conceptual Design b Project Initiation b Need and Purpose b Stakeholder Outreach b Project Delivery Planning – Preliminary Design b Engineering Studies b Environmental Analysis b Options Analysis – Final Design b PS&E b Right-of-Way Acquisition b Utility Relocation – Construction b Advertise, Bid, and Award b Construction b Change Orders and Claims Management b Project Closeout • Project Management is still a developing concept for many DOTs.
From page 95...
... • Colorado DOT has developed excellent materials related to the provision of guidance in selecting the most appropriate delivery method through its Project Delivery Selection Matrix. • There is an opportunity to better leverage VECPs and ATCs for all the project delivery methods.