... NCHRP Project 12-102 165 C H A P T E R 6 ABC Construction Specification Development 6.1 Approach This project is essentially a large-scale synthesis of past work. No formal laboratory research was complete under this project.
From page 166...
... NCHRP Project 12-102 166 • The term "may" indicates a criterion that is usable, but other local and suitably documented, verified, and approved criterion may also be used in a manner consistent with the LRFD approach to bridge design. • The term "recommended" is used to give guidance based on past experiences.
From page 167...
... NCHRP Project 12-102 167 Assembly of a prefabricated bridge or a bridge system requires careful planning. These guide specifications include provisions for development of assembly plans, which are more detailed than conventional erection plans.
From page 168...
... NCHRP Project 12-102 168 proprietary nature of this concrete. The placement, finishing and curing of UHPC requires special care, therefore provisions were developed to cover all aspects of UHPC construction.