Skip to main content

Currently Skimming:


Pages 104-112

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 104...
... 104 Equipment Replacement Processes This chapter describes how to use the tool to support the replacement process. 6.1 Replacement Process The guide outlines a 12-step, systematic process for annual equipment replacement.
From page 105...
... 105 • Accumulated mileage or hours reach the replacement target mileage or hours set in the configuration file. • Accumulated total cost per mile or hour exceeds the class average by 25%.
From page 106...
... 106 Once opened, the form will display the spreadsheet shown in Figure 28. The guide provides detailed instructions for completing the assessments.
From page 107...
... Figure 29. Entry of condition assessment scores.
From page 108...
... 108 the Priority Replacement List. The de facto priority replacement ranking will be that shown on the ReplacementTargets tab in Figure 26.
From page 109...
... 109 - in 2020 column designates years past due. Figure 33.
From page 110...
... 110 Optimal Figure 35. Sample cost consequences results.
From page 111...
... 111 Figure 36. File button for saving work.
From page 112...
... 112 Figure 39. Selecting the folder.

Key Terms



This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.