... NCHRP Project 25-48 8 Project Deliverables The NCHRP 25-48 Project Deliverables were organized into seven tasks. These are described briefly below.
From page 9...
... NCHRP Project 25-48 9 In July 2015, EPA proposed a rulemaking for the Guideline on Air Quality Models (https://www3.epa.gov/scram001/11thmodconf.htm) to replace the models based on CALINE3 with AERMOD due to the "more scientifically sounds basis for AERMOD, improved model performance over CALINE3, and the availability of more representative meteorological data…".
From page 10...
... NCHRP Project 25-48 10 Desktop-Based Application The RSG-Lakes Environmental team recommended that TRAQS be developed as a desktop application. This recommendation is based on careful consideration of requirements specified in the RFP, combined with extensive experience of both companies in developing applications utilizing both desktop and web-applications.
From page 11...
... NCHRP Project 25-48 11 Table 3. Applicable Open-Source Models OPEN-SOURCE SOFTWARE DESCRIPTION OpenStreetMap (OSM)
From page 12...
... NCHRP Project 25-48 12 TRAQS Bug Fixes Typical to the industry, Lakes Environmental implemented a comprehensive test program to verify software functions before deployment and to minimize the introduction of bugs. During the software development process, extensive effort was invested in eliminating bugs or other defects before deployment for beta testing.
From page 13...
... NCHRP Project 25-48 13 Figure 2. Preprocessor Figure 3 illustrates the primary model outputs including concentration contour plots, charts (e.g., line, pie, bar graphs)
From page 14...
... NCHRP Project 25-48 14 Figure 3. Post Processor The post processor enables users to calculate design values by entering background concentrations, compare these values with NAAQS, and allow users to compare results from multiple project scenarios such as build / no-build scenarios.
From page 15...
... NCHRP Project 25-48 15 Task 2: Stakeholder Input The central objective of Task 2 was to implement outreach to an expert community of Project-Level practitioners in order to obtain input regarding the features of TRAQS. Within Task 2, RSG convened a Stakeholder Panel, referred to as the Stakeholder Outreach Group (SOG)
From page 16...
... NCHRP Project 25-48 16 members on November 19, 2014. The survey was closed on January 15, 2015.
From page 17...
... NCHRP Project 25-48 17 responses of this group to the survey provide good guidance to the Project Team in classifying aspects or features of TRAQS. We consider three classifications as: • Necessary/Essential -- ("must" statements)
From page 18...
... NCHRP Project 25-48 18 remaining project resources on the ESRI and Google Earth mapping capabilities. This limitation applies to Findings 21 and 22 as well)