Skip to main content

Currently Skimming:


Pages 210-211

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 210...
... D-1 Appendix D: Final Guidelines The final Guidelines for Geotechnical Risk Management in DB projects is published as NCHRP Research Report 884. It can be found at the TRB website.
From page 211...
... D-2 5.1 Geotechnical Issues & Available Risk Mitigation Strategies 5.2 Methods for Implementing Tools 5.3 Tools 5.4 Strategies, Methods, and Tools for Risk Mitigation Chapter 6 Geotechnical Risk Monitoring, Control, and Retirement 6.1 Post-Award geotechnical risk register 6.1.1 Geotechnical risk register update with design-builder. 6.1.2 Geotechnical design decision register 6.1.3 Translating risks to early mitigation actions 6.2 Retiring geotechnical risks 6.2.1 Putting geotechnical risks on the project schedule 6.2.2 Geotechnical risk retirement conferences 6.2.3 Releasing geotechnical risk contingencies Chapter 7 Design-Build Geotechnical Risk Management Planning Workshop Template 7.1 DB Project Geotechnical Risk Management Plan 7.2 Example DB Project Geotechnical Risk Management Plan References Appendix A – Glossary of Geotechnical and Risk Terms Appendix B – Geotechnical Risk Management Workshop Templates Appendix C – Detailed Explanation of Geotechnical Risk Management Strategies, Methods, and Tools.

Key Terms



This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.