... D-1 APPENDIX D Field Exercise Plan
From page 101...
... D-2 Contents D.1  FIELD TRIAL OVERVIEW .....................................................................................................
From page 102...
... D-3 List of Figures Figure D-1. Location of test bridges and the S-BRITE Center at Purdue University, Indiana (Google Earth)
From page 103...
... D-4 List of Tables Table D-1. NBI data test bridges I1 and I2.
From page 104...
... D-5 D.1 Field Trial Overview This portion of the report describes the test bridges and inspection protocols for the field exercises described in the research. These included test bridges in Indiana and Michigan to be used as field test sites for evaluating the effect of using newly developed guidelines (i.e., the visual guide)
From page 105...
... D-6 The Michigan inspection exercise was completed on two days with two groups of five inspectors on each day, due to unavailability of all inspectors on the same day. The inspectors were qualified bridge inspectors currently conducting routine inspection for highway bridges using element-level data collection.
From page 106...
... D-7 6. The bridges should be of ordinary size.
From page 107...
... D-8 Two twin bridges with steel superstructures were chosen for the field exercises in Indiana (ID # I65-17905487 BNBL and BSBL, north and south bound)
From page 108...
... D-9 Figure D-2. Photograph of test bridges I1 (ID #I65-179-05487 BNBL)
From page 109...
... D-10 without section loss. The amount of section loss is not quantified in the current defect description for defect element 1000 - Corrosion.
From page 110...
... D-11 Table D-2. Element listing for bridge I1.
From page 111...
... D-12 Figure D-3. Reinforced Concrete Bridge Deck Delamination/Spall/Patched Area.
From page 112...
... D-13 Figure D-5. Reinforced Concrete Approach Slab Delamination/Spall/Patched Area and Cracking.
From page 113...
... D-14 Figure D-7. Example of fascia girder coating on bridge I1.
From page 114...
... D-15 about 99% of its surface area recorded in CS 2, as compared with bridge I1 which has 99% of its area in CS 1. Table D-3.
From page 115...
... D-16 Figure D-9. Reinforced Concrete Bridge Deck Delamination/Spall/Patched Area.
From page 116...
... D-17 Figure D-11. Reinforced Concrete Approach Slab Delamination/Spall/Patched Area and cracking.
From page 117...
... D-18 Figure D-13. Movable Bearing damaged by corrosion.
From page 118...
... D-19 Table D-4. Steel open girder/beam elements in bridge I1 and I2.
From page 119...
... D-20 These damaged areas provided a means of evaluating the ability of inspectors to accurately describe the damage areas. Figure D-14 shows diagrams of the damage in bridges I1 and I2, to illustrate the difference in the amount of damage recorded on the surface of the wearing surface.
From page 120...
... D-21 Table D-6. Substructure elements of bridges I1 and I2.
From page 121...
... D-22 D.4.1 Protocol for testing D.4.1.1 Introduction and Testing During this task, the study participants will be introduced to the field inspection exercise and provided a short refresher on use of the guideline. This task will refresh information previously provided in a webinar.
From page 122...
... D-23 The color vision test to be completed by participants is a Ishihara test, which is a color perception test for red-green color deficiencies. Again, this test will be familiar to participants, and is a simple method of identifying if inspectors have any sort or red-green color vision deficiency.
From page 123...
... D-24 the accuracy requirements for element-level bridge inspection, and identifying suitable procedures for element-level data collection. Additionally, this task will study the effect of changing the units of measure for elements, for example, element 515, Steel Protective Coating.
From page 124...
... D-25 will be completed (S-BRITE 2 and S-BRITE 3) , and then the appliques will be rearranged with different total quantities for two other tasks (S-BRITE 4 and S-BRITE 5)
From page 125...
... D-26 Table D-8. Summary of data and methods for Task E
From page 126...
... D-27 D Figure D-18. Example of a page test for estimating area based on percentage showing 5% (top)
From page 127...
... D-28 Outcomes: The completion of this task provided data on the accuracy of an area estimate based on the percentage of area, with a comparison between using a visual guide and not using a visual guide. The expected outcome was an improvement in the accuracy of the estimate using the visual guide.
From page 128...
... D-29  Data for the comparison of the efficiency of different estimating methods (estimating % as compared with tallying individual lengths)
From page 129...
... D-30 Figure D-20. Steel truss to be used for linear length estimation.
From page 130...
... D-31 The superstructure members had similar amounts of damage that is common for prestressed girders, namely cracking and spalling near the supports. It was expected that the assessment of this element would provide a measure of the variation in quantities and defect assignment for elements measured in ft.
From page 131...
... D-32 Figure D-22. Photograph of elevation view of bridge M2.
From page 132...
... D-33 Figure D-24. Locations of test bridges in Michigan (Google Earth)
From page 133...
... D-34 Table D-11. Elements assessed for bridges M1 and M2.
From page 134...
... D-35 Figure D-26. Reinforced concrete columns and pier cap in bridge M1.
From page 135...
... D-36 Task M.1 Outcome Each bridge had a similar level of damage in the prestressed elements and the bridges are of the same design with the same access for inspection. Therefore, the inspection results provided data on the variation in inspection results of five inspections that used the new visual guide and five inspections that did not use the visual guide.
From page 136...
... D-37 Task M.4 Assessment of columns using units of ft During this task, all participants were asked to assess the columns of the bridge using the unit of ft rather than the conventional unit of ea. A key element of this task was to gather data on the accuracy of the data collected using ft as compared with the actual condition of the columns, and to measure the time required to make the assessment.
From page 137...
... D-38 Table D-12. NBI data for test bridge M3 Code Value Code Value [27]
From page 138...
... D-39 Table D-13. Elements and defects for bridge M3 Figure D-28 shows the bridge deck with noticeable spalling and patching.
From page 139...
... D-40 Figure D-29. Damage in span 5 of bridge M3.
From page 140...
... D-41 Figure D-30. Slope at east end of bridge M3 (MDOT)
From page 141...
... D-42 Table D-15. Bridge M4 element condition state rating.
From page 142...
... D-43 Figure D-32. Diagram showing damage in deck M4, spans 1-3.
From page 143...
... D-44 Table D-16. Element listing for inspection of bridge M1 and M2.
From page 144...
... D-45 D.6 Schedule This section of the report describes the schedule for the field exercises in each state. As described previously, the duration of the testing for each inspector was limited to one day to facilitate scheduling.
From page 145...
... D-46 Appendix A: Pre-Test and Post-Test Questionnaire This appendix includes the pre-test and post-test questionnaires that were given to the inspectors before and after the field exercises.
From page 146...
... D-47 NCHRP 12-104 "Guidelines to Improve the Quality of Element-Level Bridge Inspection Data" Pre-test questionnaire What is the highest education level that you have completed?
From page 147...
... D-48 1. When inspecting a deck, which of the following methods do you use to assess the area of damage in the deck (circle)
From page 148...
... D-49 NCHRP 12-104 "Guidelines to Improve the Quality of Element-Level Bridge Inspection Data" Post-test questionnaire Have you inspected this bridge before? Were these bridges similar to bridges you commonly inspect?
From page 149...
... D-50 Please rate the ease of the use of the visual guide. Easy Easiest 1 2 3 4 5 Based on your experience during the field exercise, do you feel that the guideline would assist you in rating bridge element in the field?
From page 150...
... D-51 Appendix B: Inspection Forms for Field Exercises and S-BRITE Tasks This appendix includes the inspection forms that were used for the field exercises. A separate form was used for each bridge.
From page 151...
... Inspection Form Bridge I1 (BNBL) Task 1 D-52 NCHRP 12-104 "Guidelines to Improve the Quality of Element-Level Bridge Inspection Data" Bridge I1 (BNBL)
From page 152...
... Inspection Form Bridge I1 (BNBL) Task 1 D-53 Element /Defect # Element/Defect Name Tot.
From page 153...
... Inspection Form Bridge I1 (BNBL) Task 1 D-54 Element /Defect # Element/Defect Name Tot.
From page 154...
... Inspection Form Bridge I2 (BSBL) Task 1 D-55 NCHRP 12-104 "Guidelines to Improve the Quality of Element-Level Bridge Inspection Data" Bridge I2 (BSBL)
From page 155...
... Inspection Form Bridge I2 (BSBL) Task 1 D-56 Element /Defect # Element/Defect Name Tot.
From page 156...
... Inspection Form Bridge I2 (BSBL) Task 1 D-57 Element /Defect # Element/Defect Name Tot.
From page 157...
... Inspection Form Bridge I2 (BSBL) Task 2 D-58 NCHRP 12-104 "Guidelines to Improve the Quality of Element-Level Bridge Inspection Data" Bridge I2 (BSBL)
From page 158...
... Inspection Form Bridge M1 (Part A) D-59 NCHRP 12-104 "Guidelines to Improve the Quality of Element-Level Bridge Inspection Data" Bridge M1 (3804)
From page 159...
... Inspection Form Bridge M1 (Part A) D-60 Element /Defect # Element/Defect Name Tot.
From page 160...
... Inspection Form Bridge M1 (Part A) D-61 Please rate the following NBIS elements: Item Number/Name N -N ot A pplicable 9-Excellent 8-V ery good 7 - G ood 6-Satisfactory 5-Fair 4-Poor 3-Serious 2-C ritical 1-Im m inent Failure 0 - Failed 59Superstructure 60- Substructure
From page 161...
... Inspection Form Bridge M1 (Part B) D-62 NCHRP 12-104 "Guidelines to Improve the Quality of Element-Level Bridge Inspection Data" Bridge M1 (3804)
From page 162...
... Inspection Form Bridge M2 (Part A) D-63 NCHRP 12-104 "Guidelines to Improve the Quality of Element-Level Bridge Inspection Data" Bridge M2 (3805)
From page 163...
... Inspection Form Bridge M2 (Part A) D-64 Element /Defect # Element/Defect Name Tot.
From page 164...
... Inspection Form Bridge M2 (Part A) D-65 Element /Defect # Element/Defect Name Tot.
From page 165...
... Inspection Form Bridge M2 (Part B) D-66 NCHRP 12-104 "Guidelines to Improve the Quality of Element-Level Bridge Inspection Data" Bridge M2 (3805)
From page 166...
... Inspection Form Bridge M3 D-67 NCHRP 12-104 "Guidelines to Improve the Quality of Element-Level Bridge Inspection Data" Bridge M3 (2253) Inspection Form Element /Defect # Element/Defect Name Tot.
From page 167...
... Inspection Form Bridge M3 D-68 Element /Defect # Element/Defect Name Tot.
From page 168...
... Inspection Form Bridge M4 D-69 NCHRP 12-104 "Guidelines to Improve the Quality of Element-Level Bridge Inspection Data" Bridge M4 (2254) Inspection Form Element /Defect # Element/Defect Name Tot.
From page 169...
... Inspection Form Bridge M4 D-70 Element /Defect # Element/Defect Name Tot.
From page 170...
... Visual Estimation Form Task SBRITE 1 D-71 NCHRP 12-104 "Guidelines to Improve the Quality of Element-Level Bridge Inspection Data" Task S-BRITE1 Visual Estimation Form 1. Area covered by shapes (%)
From page 171...
... Visual Estimation Form Task SBRITE2 D-72 NCHRP 12-104 "Guidelines to Improve the Quality of Element-Level Bridge Inspection Data" Task S-BRITE2 Visual Estimation Form Side Damaged Area (%) 1 2 3 4 Start Time End Time Notes:  Please estimate the percentage of damaged area for each of the four sides of the plate girder and record your estimates in the table below.
From page 172...
... Visual Estimation Form Task SBRITE3 D-73 NCHRP 12-104 "Guidelines to Improve the Quality of Element-Level Bridge Inspection Data" Task S-BRITE3 Visual Estimation Form Side Damaged Area (sq ft) 1 2 3 4 Start Time End Time Notes:  Please estimate the sq ft of damaged area for each of the four sides of the plate girder by tallying individual areas and record your estimates in the table below.
From page 173...
... Visual Estimation Form Task SBRITE4 D-74 NCHRP 12-104 "Guidelines to Improve the Quality of Element-Level Bridge Inspection Data" Task S-BRITE4 Visual Estimation Form Side Damage (ft) 1 2 3 4 Start Time End Time Notes:  Please estimate the linear ft of damage for each of the four sides of the plate girder and record your estimates in the table below.
From page 174...
... Visual Estimation Form Task SBRITE5 D-75 NCHRP 12-104 "Guidelines to Improve the Quality of Element-Level Bridge Inspection Data" Task S-BRITE5 Visual Estimation Form Side Damage (ft) 1 2 3 4 Start Time End Time Notes:  Please estimate the linear ft of damage for each of the four sides of the plate girder by tallying individual damage and record your estimates in the table below.
From page 175...
... Visual Estimation Form Task SBRITE6 D-76 NCHRP 12-104 "Guidelines to Improve the Quality of Element-Level Bridge Inspection Data" Task S-BRITE6 Element /Defect # Element/Defect Name Tot.
From page 176...
... Visual Estimation Form Task SBRITE6 D-77 Element /Defect # Element/Defect Name Tot.