142 4.1 Conclusions A full-depth precast concrete deck panel system was developed. The system includes an innovative girder–deck connection spaced up to 6 ft, compared to the current limit of 4 ft.
|
From page 143... ...
Conclusions and Recommendations for Future Research 143 connection joints is the most critical factor in ensuring adequate structural capacity. Therefore, the research team concluded that UHPC is the best available joint material.
|
From page 144... ...
144 Simplified Full-Depth Precast Concrete Deck Panel Systems Analysis has indicated that the average loss of prestress (from the deck to the beam) is in the range of 2% to 20% for simple span bridges.
|