Skip to main content

Currently Skimming:


Pages 80-84

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 80...
... 80 This attachment describes proposed changes to three AASHTO specifications: • ASHTO M 328-14 Standard Equipment Specification for Inertial Profiler • AASHTO R 56-14 Certification of Inertial Profiling Systems • AASHTO R 57-14 Operating Inertial Profiling Systems These proposed changes to AASHTO M328-14, R56-14, and R57-14 are the suggestions of the NCHRP Project 10-93 staff. These specifications have not been approved by NCHRP or any AASHTO committee nor formally accepted for the AASHTO specifications.
From page 81...
... 81 shorter than 0.5 ft is recommended beyond that which is necessary to avoid aliasing errors. Section 5.1, with recommended additional text underlined: 5.1.
From page 82...
... 82 The test software shall activate the testing using the timing and control parameters stored by the test control setup software. The software shall monitor the signals to verify that the testing is being performed properly and indicate detectable errors.
From page 83...
... 83 8.2.5.3 Collect three repeat runs with the profiler at 45 mph. Evaluate the IRI-filtered repeatability cross-correlations among the runs and select a representative run.
From page 84...
... 84 Recommended addition of the following paragraph to Section 5.3.2.4.1: 5.3.2.4.1 .

Key Terms



This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.