Skip to main content

Currently Skimming:


Pages 1-3

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 1...
... 1 The use of alternative contracting methods (ACMs) has accelerated the delivery of highway design and construction projects.
From page 2...
... 2 Guidebooks for Post-Award Contract Administration for Highway Projects Delivered Using Alternative Contracting Methods 1.1 Problem Statement The objective of this research was to produce two practitioner guidebooks in AASHTO format based on the identification and analysis of the tools utilized on a range of ACM projects for post-award contract administration of D-B and CM-GC projects. The primary research question these guidebooks addressed was "What are the most effective tools for post-award contract administration of D-B and CM-GC projects?
From page 3...
... Introduction 3 Task 2. Develop a Draft Framework for ACM Administration -- Combine the Task 1a, 1b, and 1c findings into a coherent organizational framework that clarified roles, responsibilities, and tools for CM-GC and D-B contract administration processes.

Key Terms



This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.