... 24 C H A P T E R 5 5.1 Introduction Task 4 of this research project involved a case study approach to gather information about state agency tools and methods. The team applied a methodologically rigorous approach to select a diverse set of 30 projects representing a variety of project sizes for CM-GC and D-B.
From page 25...
... Case Study Project Selection 25 that was used for the final list of case studies (i.e., states that responded to the research team's case study requests and had projects that fit the team's desired size and delivery method)
From page 26...
... 26 Guidebooks for Post-Award Contract Administration for Highway Projects Delivered Using Alternative Contracting Methods Case Study No. Agency Project Name Contract Type Primary Facility Type Project Type Dollar Value Con.
From page 27...
... Case Study Project Selection 27 5.4 Summary The case study approach to this research project resulted in analysis of 30 projects from 18 state agencies. These construction projects were executed using D-B or CM-GC contracting methods, and sizes ranged from $2 million to $600 million.