Skip to main content

Currently Skimming:


Pages 21-23

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 21...
... 21 The electronic version of the workbook, the e-WOW, includes three modules: 1. Module I determines the required staffing level at each position (project engineer, surveyor, inspector, and administrative staff)
From page 22...
... 22 Workforce Optimization Workbook for Transportation Construction Projects Figure 5-1. Initial interface of e-WOW.
From page 23...
... The e-Workforce Optimization Workbook 23 Figure 5-3. Example e-WOW staff allocation module.

Key Terms



This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.