... Proposed Practice for Validating Contractor Test Data 85 assessment. In the case that CVL 1 is not validated then lot 1 is considered not validated, and the next CVL should consider results from lot 2, lot 3, and lot 4.
From page 86...
... 86 Procedures and Guidelines for Validating Contractor Test Data 1. Calculate the sample average ( )
From page 87...
... Proposed Practice for Validating Contractor Test Data 87 Example 2. The following three air-void results were obtained.
From page 88...
... 88 Procedures and Guidelines for Validating Contractor Test Data TABLE B.1 tcrit values for a 5% Significance Level * tcrit 3 1.155 4 1.481 5 1.715 6 1.887 7 2.020 8 2.126 9 2.215 10 2.290 11 2.355 12 2.412 13 2.462 14 2.507 15 2.549 16 2.585 17 2.620 18 2.651 19 2.681 20 2.709 21 2.733 22 2.758 23 2.781 24 2.802 25 2.822 26 2.841 27 2.859 28 2.876 29 2.893 30 2.908 *