... B-1 Appendix B ATC "Better Than or Equal To" Assessment Introduction Alternative Technical Concepts (ATCs) provide a means for proposers to modify contract requirements for a competitive advantage (Gransberg, et al.
From page 84...
... B-2 The implementation of standard VfM assessment processes in ATC contracting would make it easier for DOTs to justify ATC accept/reject decisions and would facilitate a more transparent process decreasing the risk of claims from contractors. DOTs trust that any potential claims "that may arise regarding conducting an ‘apples to apples' comparison of proposals is resolved by requiring the ATC to meet the ‘equal to or better' standard" (WSDOT 2010)
From page 85...
... B-3 agency needs to identify the key areas for comparison between potential ATCs and original contract requirements (evaluation areas – e.g. cost, time, quality, traffic control, and environmental impact)
From page 86...
... B-4 Figure B.1. Three E's Value for Money Framework (adapted from Emmi et al.
From page 87...
... B-5 proposed by the NCHRP Report 561: Best Value Procurement Methods for Highway Construction Projects (Scott et al.
From page 88...
... B-6 Table B.4. DFID VfM Assessment Model – Economy Scoring Sheet (adapted from Barnett et al.
From page 89...
... B-7 Table B.5. ICAI VfM Assessment Model – Parameters and Evaluation Criteria (adapted from ICAI 2011)
From page 90...
... B-8 Table B.7 presents and describes the set best-value parameters and evaluation criteria proposed in the NCHRP Report 561. It should be noted that the proposed criteria include cost and non-cost factors.
From page 91...
... B-9 Table B.8. Best-Value Rating Systems (adapted from Scott et al.
From page 92...
... B-10 The research team recognizes that many of the concepts discussed above will be burdensome to DOT if they are implemented. The comments received from both the practitioner members of the research team and the industry steering group indicate that conducting a full-blown VfM analysis on the order of those done for P3 projects is unrealistic.