Skip to main content

Currently Skimming:


Pages 62-62

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 62...
... 62 ACC Alternative configuration concept ACM Alternative contracting method AFC Alternative financial concept AGC Associated General Contractors of America ATC Alternative technical concept CATC Conceptual alternative technical concept CMGC Construction manager/general contractor CMR Construction manager at-risk DB Design-build DBB Design-bid-build DBF Design, build, finance DBFOM Design, build, finance, operate, maintain DBOM Design, build, operate, maintain DOT Department of transportation EDC Every Day Counts (FHWA program) GMP Guaranteed maximum price I/D Incentive/disincentive IFB Invitation for bid LD Liquidated damages NEPA National Environmental Policy Act PAE Pre-approved element PAM Performance Attribute Matrix PDB Progressive design-build PS&E Plans, specifications, and estimates PTC Proposed technical concept P3 Public–private partnership QA Quality assurance RFI Request for information RFP Request for proposal RFQ Request for qualifications ROW Right of way SOQ Statement of qualifications Abbreviations

Key Terms



This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.