... D-1 A P P E N D I X D Florida DOT Warranty Information Section 8.14 Value Added Features Available at: https://fdotwww.blob.core.windows.net/sitefinity/docs/defaultsource/construction/manuals/cpam/ newcleanchapters/chapter8s14.pdf? sfvrsn=2b67a861_2 8.14.1 PURPOSE To establish a standard administrative procedure for tracking and monitoring Value Added Features (VAF)
From page 128...
... D-2 Performance-Based Pavement Warranty Practices CIM system. The durations for the warranty period for a VAF are pre-loaded by the CIM system based on the warranty duration designated by the specifications.
From page 129...
... Florida DOT Warranty Information D-3 to the Statewide Warranty Coordinator in the State Construction Office (SCO) to initiate the appropriate action in accordance with the specifications.
From page 130...
... D-4 Performance-Based Pavement Warranty Practices DWC will document the RP's receipt of notification. If no deficiencies are observed during the inspections (interim or final)
From page 131...
... Florida DOT Warranty Information D-5 8.14.10 VALUE ADDED REWORKED ASPHALT CONCRETE PAVEMENT (Spec. Section 338B)
From page 132...
... D-6 Performance-Based Pavement Warranty Practices all the work or facilities within the project limits of the Contract will terminate in accordance with 5-11; with the sole exception that the obligations set forth in this Section for Value Added Asphalt Pavement will continue thereafter to be the responsibility of the Responsible Party as otherwise provided in this Section. 338-4 Statewide Disputes Review Board.
From page 133...
... Florida DOT Warranty Information D-7 Pot holes and Slippage Area(s)
From page 134...
... D-8 Performance-Based Pavement Warranty Practices TABLE 338-3 Category 3 Pavements Type of Distress Threshold Values Remedial Work Rutting N/A N/A Cracking Cumulative length of cracking > 500 feet for Cracks > 1/8 inch See Table 338-1 Surface Deterioration (1) See Table 338-1 See Table 338-1 Settlement/Depression(2)
From page 135...
... Florida DOT Warranty Information D-9 and restore the pavement to its original design condition within 72 hours of written notification, the Engineer has the authority to have the remedial work performed by other forces. Temporary mitigation includes the use of traffic control systems such as barricades, drums, or other approved devices to secure the area including lane closures if necessary, and constructing temporary repairs making it safe for the roadway user until the defect can be restored to its original design condition.
From page 136...
... D-10 Performance-Based Pavement Warranty Practices 355-3 Statewide Disputes Review Board. The Statewide Disputes Review Board in effect for this Contract will resolve any and all disputes that may arise involving administration and enforcement of this Specification.
From page 137...
... Florida DOT Warranty Information D-11 355-5 Remedial Work. Perform all necessary remedial work described in this Section at no cost to the Department.
From page 138...
... D-12 Performance-Based Pavement Warranty Practices 355-6 Failure to Perform. Failure to timely submit any dispute to the Statewide Disputes Review Board, failure to satisfactorily perform any remedial work, or failure to compensate the Department for any remedial work performed by the Department and determined to be the Contractor's responsibility in accordance with this Specification, the Department will suspend, revoke or deny the Contractor's certificate of qualification under the terms of Section 337.16(d)
From page 139...
... Florida DOT Warranty Information D-13 (c) A claimant, except a laborer, who is not in privity with the contractor shall, before commencing or not later than 90 days after commencing to furnish labor, materials, or supplies for the prosecution of the work, furnish the contractor with a notice that he or she intends to look to the bond for protection.
From page 140...
... D-14 Performance-Based Pavement Warranty Practices charges, based on original contract amounts, for construction contracts entered into by the department, which schedule shall be incorporated by reference into the contract. The department shall update the schedule of liquidated damages at least once every 2 years, but no more often than once a year.
From page 141...
... Florida DOT Warranty Information D-15 Project Administration Process for Valued Added Asphalt Pavement during Warranty Period
From page 142...
... D-16 Performance-Based Pavement Warranty Practices EXPLANATION OF FLOW CHART STEPS for DURING WARRANTY PERIOD PROJECT ADMINISTRATIVE PROCESS FOR VALUE ADDED ASPHALT PAVEMENT (1) Project Final Acceptance – The Value Added Asphalt Pavement (VAAP)
From page 143...
... Florida DOT Warranty Information D-17 (13) DWC Requests SPES to Perform LOT by LOT PES – Based on DBE's information, DWC provides the detailed project information to the SPES and requests for a LOT-by-LOT PCS.
From page 144...
... D-18 Performance-Based Pavement Warranty Practices (29) RP Performs Remedial Work – The RP proceeds with the RW in compliance with the approved work plan and the DWC provides inspection services to oversee the RW thru final inspection.

Key Terms



This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.