From page 145...
... A P P E N D I X E Michigan DOT Warranty Information E-1 Guidelines for Administering Warranties on Road and Bridge Construction Contracts Available at: https://www.michigan.gov/documents/mdot/MDOT_WarrentyGuide_225426_7.pdf. Material and Workmanship Pavement Warranty (12SP-500A-04)
From page 146...
... E-2 Performance-Based Pavement Warranty Practices E Spall.
From page 147...
... Michigan DOT Warranty Information E-3 Contractor must make all necessary corrections, at their expense, prior to initial acceptance. Initial acceptance will occur as soon as the Department confirms in writing, on the initial acceptance form, that contract requirements have been met for the warranted work.
From page 148...
... E-4 Performance-Based Pavement Warranty Practices 4. Must notify the Department and submit a written course of action for performing the needed warranty work a minimum of 10 calendar days prior to commencement of warranty work, except in the case of emergency repairs as detailed in this special provision.
From page 149...
... Michigan DOT Warranty Information E-5 (NCHRP) Report 747 "Guide for Conducting Forensic Investigations of Highway Pavements." If agreement cannot be reached, either party may serve written notice that appointment of a Conflict Resolution Team (CRT)
From page 150...
... E-6 Performance-Based Pavement Warranty Practices Pavement Performance Warranty (12SP-500B-03)
From page 151...
... Michigan DOT Warranty Information E-7 Debonding. A physical separation of two HMA layers.
From page 152...
... E-8 Performance-Based Pavement Warranty Practices or the date that all corrective work was completed for any deficiencies that were observed in the delay period. The date on which initial acceptance occurs is termed the Acceptance Date of Warranted Work.
From page 153...
... Michigan DOT Warranty Information E-9 5. Must follow a Department approved maintaining traffic plan when performing warranty work.
From page 154...
... E-10 Performance-Based Pavement Warranty Practices If a dispute arises on the application or fulfillment of the terms of this warranty, either party may serve written notice that appointment of a CRT is required. At least three members of the CRT must vote in favor of a motion to make a decision.
From page 155...
... Michigan DOT Warranty Information E-11 Warranty Work Requirements New/Reconstructed Hot Mix Asphalt Pavement on Unbounded or Stabilized Base a. Description.
From page 156...
... E-12 Performance-Based Pavement Warranty Practices Table 2: Recommended Corrective Actions Condition Parameter(b) Recommended Action Transverse Cracking Cut and Seal Longitudinal Cracking Cut and Seal De-bonding Mill and Resurface affected courses Raveling Mill and Resurface affected courses Flushing Mill and Resurface top course Rutting Microsurface or Mill and Resurface(a)
From page 157...
... Michigan DOT Warranty Information E-13 Condition Parameter Threshold Limits Per Segment (Length = 528 feet)
From page 158...
... E-14 Performance-Based Pavement Warranty Practices Table 1: Warranty Requirements Condition Parameter(a) Threshold Limits Per Segment(Length = 528 feet)
From page 159...
... Michigan DOT Warranty Information E-15 The defective segments for surface distress may or may not be contiguous to necessitate corrective action. The maximum allowable number of defective segments for each condition parameter applies to each driving lane in each travel direction.
From page 160...
... E-16 Performance-Based Pavement Warranty Practices c. Warranty Term.
From page 161...
... Michigan DOT Warranty Information E-17 The defective segments for surface distress may or may not be contiguous to necessitate corrective action. The maximum allowable number of defective segments for each condition parameter applies to each warranty lane in each travel direction.
From page 162...
... E-18 Performance-Based Pavement Warranty Practices 2. Add the following to the end of subsection 502.03.D.2.b.
From page 163...
... Michigan DOT Warranty Information E-19 2. Multiple Segment Failure.
From page 164...
... E-20 Performance-Based Pavement Warranty Practices Hot Mix Asphalt Crack Treatment (CPM)
From page 165...
... Michigan DOT Warranty Information E-21 HMA Crack Treatment, Lane, Warranty includes all materials, equipment, labor for preparing, filling and sealing the cracks and complying with all requirements including the warranty, for full coverage as specified on the plans. HMA Crack Treatment, Lane, Warranty will be measured along the centerline of each lane and will include the traffic lane, as defined in the Lane Mile Inventory and any adjacent paved shoulders.
From page 166...
... E-22 Performance-Based Pavement Warranty Practices 4. HMA Mixture Design.
From page 167...
... Michigan DOT Warranty Information E-23 Table 5: Mixture Requirements Sieve Size Type B Mix % Passing Indicated Sieve Type C Mix % Passing Indicated Sieve 3/4 inch 100 1/2 inch 100 85-100 3/8 inch 85-100 55-80 No.
From page 168...
... E-24 Performance-Based Pavement Warranty Practices A Review of a work schedule.
From page 169...
... Michigan DOT Warranty Information E-25 Seal is not in compliance, then the Contractor must repair and make good at its own expense any and all defects. The Department and the Contractor must document and execute the initial acceptance on a form furnished by the Department when the Paver Placed Surface Seal is determined by the Department to be in compliance.
From page 170...
... E-26 Performance-Based Pavement Warranty Practices work. The Engineer may accept alternative corrective measures, based on unique conditions.
From page 171...
... Michigan DOT Warranty Information E-27 h. Warranty Requirements.
From page 172...
... E-28 Performance-Based Pavement Warranty Practices 4. Debonding.
From page 173...
... Michigan DOT Warranty Information E-29 Table 2: HMA Ultra-Thin Overlay Aggregate Gradation Sieve Size Total Passing Percent by Weight 1/2 inch 100 3/8 inch 99-100 No.
From page 174...
... E-30 Performance-Based Pavement Warranty Practices (8) Form 1860 - Fine Aggregate Gravity.
From page 175...
... Michigan DOT Warranty Information E-31 located when sliding the straightedge along its axis does not change the location of the contact points. Rut depth is then measured at the point of greatest perpendicular distance from the bottom of the straightedge to the pavement surface.
From page 176...
... E-32 Performance-Based Pavement Warranty Practices Sieve Analysis (MTM 109) , Total Percent Passing(a)
From page 177...
... Michigan DOT Warranty Information E-33 Table 2: Warranty Requirements for Surface Cracking Chip Seal Treatment Pavement Type Number of Defective Cracks Single Chip Seal Flexible 25 Corrective action for this parameter requires the Contractor to overband crack fill all cracks on the entire site, including shoulders if part of the chip seal work.
From page 178...
... E-34 Performance-Based Pavement Warranty Practices Sieve Analysis (MTM 109) , Total Percent Passing(a)
From page 179...
... Michigan DOT Warranty Information E-35 crack type. The total length of longitudinal cracks will be logged for each segment.
From page 180...
... E-36 Performance-Based Pavement Warranty Practices g. Corrective Action.