... 104 Implementation 5.1 Construction Typically, a restroom or amenities project will be part of a larger airport project. It may be within a new terminal or expansion, or it may be part of a renovation of a specific area of the airport, perhaps baggage claim.
From page 105...
... Implementation 105 so implementation decisions should be made with a long view in the context of the airport's overall master plan. 5.1.2 Delivery Methods Today's construction industry offers a variety of project delivery methods: • Design-bid-build • Design-negotiate-build • Design-build • Construction management • Owner-build • Integrated project delivery The choice of project delivery method, however, is affected by an airport's unique legal requirements, which are based on the type of governance.
From page 106...
... 106 Planning and Design of Airport Terminal Restrooms and Ancillary Spaces legally that the cost of sole-sourced products is a small percentage of the overall construction cost as the labor cost is not included. 5.1.4 Prefabricated Restrooms Prefabricated restrooms are a concept that evolved primarily from hospital projects where pre-assembled headwalls with all the equipment and finishes in place when shipped to the site were installed in a fraction of the normal construction time.