Skip to main content

Currently Skimming:


Pages 3-6

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 3...
... 3 Introduction Digital terrain models (DTMs) are three-dimensional (3D)
From page 4...
... 4 Practices for Construction-Ready Digital Terrain Models savings (through elimination of staking and stringlines) , increased productivity, fewer conflicts, and fewer changes.
From page 5...
... Introduction 5 1.2 Synthesis Objective This synthesis seeks to gather state-of-practice information regarding the current processes and strategies for effective use and transfer of DTMs from design into the construction phase of highway projects. DTMs have significant potential to improve the accuracy and efficiency of construction and inspection operations, yet little research exists to detail practices and performance.
From page 6...
... 6 Practices for Construction-Ready Digital Terrain Models examples to provide an in-depth understanding of the successes, challenges, and barriers to using DTMs in construction. Five of the chosen states had significant experience, both in time and number of projects, with DTMs.

Key Terms



This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.