Pages 83-86

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 83...
... 83 5. HYDROPLANING MITIGATION SOLUTIONS This section presents a critical review of existing solutions for sites with high HP identified by a low PM, including estimated cost, potential drawbacks (if any)
From page 84...
... 84 considering the minimum required sight distance needed for passing other drivers and stopping when there is an object ahead. To minimize sight distance problems, the K-value controls the rate of vertical curvatures, which is the length of the curve (L)
From page 85...
... 85 the slope of pavement. The grooves are typically 0.25 in.
From page 86...
... 86 5.2. ENFORCEMENT AND TRAFFIC CONTROL Although outside the scope of the study, if potential hydroplaning problems requiring some type of construction solution are identified, temporary signs alerting drivers to reduce speed or that the pavement is slippery when wet can be put in place as soon as possible.