From page 185...
... 185 The following section presents the recommended selection guidelines and the process for the application of the guidelines for the selection of MASH TL2 though TL5 bridge railings. A risk approach applicable to new construction, rehabilitation and retrofitting is recommended.
From page 186...
... 186 by entering Table 68 or Figure 30 with the bi-directional construction year AADT from Step 1 and the highway type.
From page 187...
... 187 reasonable. Penetrating the railing has the possibility of causing at least one non-motor vehicle injury or fatality.
From page 188...
... 188 f. Regional concerns about snow removal, hydrological impact of flood waters flowing over the bridge, and maintaining scenic views may also play a role in the selection of bridge railings beyond these selection guidelines.
From page 189...
... 189 Table 67. Encroachment Adjustments.
From page 190...
... 190 Table 68. AADT – Lifetime Encroachments per 1,000-ft of Bridge Railing.
From page 191...
... 191 Figure 30. AADT – Lifetime Encroachments/1,000-ft of Bridge Railing Nomograph.
From page 192...
... 192 Figure 31. Minimum Horizontal Curve Radius Based on Barrier Obstruction to the Stopping Sight Distance Compared to AASHTO Exhibit 3-14.
From page 193...
... 193 LOW MEDIUM HIGH Figure 32. Test Level Selection Nomograph (Risk<0.01 in 30 years for 1000 ft of bridge railing)