Skip to main content

Currently Skimming:


Pages 1-3

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 1...
... 1   is preface, normally not included in a System Requirements Specication (SyRS) document, introduces background topics that set the tone for this model SyRS.
From page 2...
... 2 Initiating the Systems Engineering Process for Rural Connected Vehicle Corridors deployers. It addresses the core, common priorities and provides a base document that a deploying agency can customize to t their project and situation.
From page 3...
... Preface 3   be that transportation operators need to collect, fuse, and analyze traffic management data. That user need would then be broken down into multiple requirements stating what specific types of traffic management data need to be collected, what sources that data needs to be collected from, and what sources of data need to be fused for analysis.

Key Terms



This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.