Skip to main content

Currently Skimming:


Pages 152-159

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 152...
... 152 Survey Instrument A P P E N D I X B "TCRP Synthesis J-07/Topic SG-19" Project Title: Paratransit Service Delivery Models for Small Systems Project Purpose: As demand for complementary paratransit (paratransit) and other demand responsive transportation (DRT)
From page 153...
... Survey Instrument 153   Page 2: Organizational Structure (check one box only) Agency/organization is a local or regional public transit agency or authority Agency/organization is a division/department of a municipality (city or county)
From page 154...
... 154 ADA Paratransit and Other Demand-Responsive Transportation Services in Small to Midsized Transit Agencies Operated with non-dedicated vehicles only (e.g., taxis and/or TNCs) Operated with dedicated and non-dedicated vehicles Page 5: Functional DRT Responsibility (check one box only in each row)
From page 155...
... Survey Instrument 155   Page 7: Number of Paratransit /DRT Operations Contractors Number of operations contractors 0 1 2 3 4 5 If more than one contractor, indicate percentage split of trips for each contractor Contractor 1: ____% Dedicated Service Non-Dedicated Service Contractor 2: ____% Dedicated Service Non-Dedicated Service Contractor 3: ____% Dedicated Service Non-Dedicated Service Contractor 4: ____% Dedicated Service Non-Dedicated Service Contractor 5: ____% Dedicated Service Non-Dedicated Service Are operations contractors assigned to zones? No Yes Number of Zones ___ Page 8: Contractor Payment Structure (check all that apply)
From page 156...
... 156 ADA Paratransit and Other Demand-Responsive Transportation Services in Small to Midsized Transit Agencies Page 10: Supporting Technology Reservation/scheduling/dispatching software Yes or No Dynamic optimization (day-of; 2+ hours in advance) Yes or No Driver communication Radios Yes or No MDTs (including GPS and other)
From page 157...
... Survey Instrument 157   Page 12: Performance Standards – Under Goal or Service Standard. enter number or percentage or "none" as appropriate.
From page 158...
... 158 ADA Paratransit and Other Demand-Responsive Transportation Services in Small to Midsized Transit Agencies Page 14: Service Model Benefits - What do you think are the major benefits of your current service model? Check all that apply.
From page 159...
... Survey Instrument 159   Page 16: Service Model Changes - Have you recently (within the last 5 years) changed your service model?

Key Terms



This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.