Skip to main content

Currently Skimming:


Pages 288-288

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 288...
... 6 Port reception facilities for garbage 6.1 The methodology for determining the adequacy of a reception facility should be based on the needs of each type of ship, as well as the number and types of ships using the port. The size and location of a port should be considered in determining adequacy.


This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.