Skip to main content

Currently Skimming:

REFERENCES
Pages 82-92

The Chapter Skim interface presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter.
Select key terms on the right to highlight them within pages of the chapter.


From page 82...
... 1993a. Hydraulic Testing of Salado Formation Evaporites at the Waste Isolation Pilot Plant: Second Interpretive Report.
From page 83...
... 1995. Thermodynamical Damage Recovery Parameters for Rocksalt from the Waste Isolation Pilot Plant.
From page 84...
... 1995a. Draft Title 40 CFR 191 Compliance Certification Application for the Waste Isolation Pilot Plant.
From page 85...
... October 1995a. Coupled Multiphase Flow and Closure Analysis of Repository Response to Waste~enerated Gas at Me Waste Isolation Pilot Plant (WIPP)
From page 86...
... 1990. Core Analyses for Selected Samples from the Culebra Dolomite at the Waste Isolation Pilot Plant Site.
From page 87...
... 1993. Permeability and Hydraulic Diffusivity of Waste Isolation Pilot Plant Repository Salt Inferred from Small-Scale Brine Inflow Experiments.
From page 88...
... 1984. Review of the Scientific and Technical Criteria for the Waste Isolation Pilot Plant.
From page 89...
... 1995. An Introduction to the Mechanics of Performance Assessment Using Examples of Calculations Done for the Waste Isolation Pilot Plant Between 1990 and 1992.
From page 90...
... 1995. Waste Isolation Pilot Plant Land Withdrawal Amendment Act.
From page 91...
... 1996. The Effect of Stratigraphic Dip on Brine Inflow and Gas Migration at the Waste Isolation Pilot Plant.


This material may be derived from roughly machine-read images, and so is provided only to facilitate research.
More information on Chapter Skim is available.