Below is the uncorrected machine-read text of this chapter, intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text of each book. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.

EXECUTIVE SUMMARY 1 Executive Summary Cost is a major factor in most decisions regarding construction, and cost estimates are prepared throughout the planning, design, and construction phases of a construction project. All of these estimates are important because they invariably influence the expenditure of major sums. However, estimates made in the early phases of a project are particularly important because they affect the most basic decisions about a project: whether it will be undertaken at all; how large it will be; how elaborate, sophisticated and durable it will be; and how much it will cost (i.e., what the budget will be and, in the case of federal agencies, what the congressional appropriation will be). Federal agencies, like most organizations with large continuing construction programs, have long recognized the importance of these early estimates, and they have instituted various policies and procedures to help ensure that such estimates are prepared carefully and properly. Yet problems associated with inaccurate early estimates have persisted and manifest themselves in various ways, including: (1) failure to award a construction contract because of excessively high bids, (2) receipt of embarrassingly low bids, (3) design problems, (4) project delays, and (5) facilities with marginal or impaired operations. Because Congress maintains fairly tight control on federal expenditures, agencies have limited leeway to deal with problems caused by erroneous early estimates. Consequently, agencies periodically look for ways to improve their early estimates. In 1988 the agencies that sponsor the Federal Construction Council asked the Building Research Board (BRB) to review their current practices and, if possible, recommend ways of improving those practices. The study was conducted by the BRB Committee on Budget Estimating Techniques. PUTTING THE PROBLEM IN PERSPECTIVE As part of its study the committee investigated the extent, nature, and root causes of the budgetrelated problem experienced by federal agencies on their construction projects. The committee found that agencies do in fact encounter budget-related problems on a significant percentage of their construction projects (approximately 35 percent on average). However, the committee also concluded that, contrary to widespread belief, such problems are not primarily the result of faulty estimating techniques. Although there is room for improvement in the policies and practices of many agencies regarding the preparation of early estimates, agencies need to recognize that other factors besides estimates contribute to budget-related problems. The committee believes that the keys to a successful project, other than accurate estimates, are (1) accurate definition of user needs, (2) effective management of the design process, (3) well- prepared construction documents, and (4) effective management of the construction phase. The committee urges agencies to seek ways to

EXECUTIVE SUMMARY 2 improve their practices and procedures in these areas as they continue to work to improve their estimating procedures. COMMITTEE RECOMMENDATIONS The procedures used by most of the federal agencies to prepare early estimates are not necessarily poor or inadequate; in fact, similar procedures are used by many private organizations. The results achieved, in terms of the extent of disparity between early estimates and contract awards, also are in line with the experiences of private companies. However, in view of the importance attached to controlling federal expenditures and the amount of critical attention estimates receive when budgets are exceeded, the committee had expected to see more evidence of emphasis on interagency cooperation and innovative approaches. On the basis of its review of a variety of ideas for improving the estimating procedures of federal agencies, the committee recommends that agencies: 1. Make a concerted effort to cooperate in the following ways: by developing standard terminology and formats for their budgets and estimates; by cosponsoring cost engineering research and sharing research results, especially research on automated estimating systems; and by pooling and sharing cost data, especially on commonly constructed facilities. 2. Take steps to ensure that the estimators used by private architect-engineer (A-E) firms, as well as the agencies' own estimators, are properly qualified for conceptual estimating. 3. Expand the use of parametric and probabilistic estimating during the early stages of a project. In view of the fact that a majority of problems associated with budget estimates can be traced to problems other than estimating techniques, the committee urges agencies to seek ways to improve their practices and procedures in the following areas: 1. Ensure that accurate definitions of user needs are prepared and signed off by the responsible parties prior to the development of budget estimates. 2. Place more emphasis on estimating and cost management capability in the selection of A-E's and ensure that sufficient fee allocations are included and sufficient time is provided for adequately performing the required estimating services. 3. Provide effective agency management of the design process to ensure that the A-E's design is within budget. Agencies should employ value engineering and other cost containment techniques and ensure that a well-coordinated and comprehensive set of construction documents are prepared. 4. Provide effective management of the construction phase to maintain time and quality objectives and cost limits. 5. Sponsor conceptual estimating training programs to improve estimating skills. Agencies should ensure adequate salary levels to hire and retain qualified staff.

Next: 1 Introduction »
Improving the Accuracy of Early Cost Estimates for Federal Construction Projects Get This Book
×
 Improving the Accuracy of Early Cost Estimates for Federal Construction Projects
Buy Paperback | $40.00
MyNAP members save 10% online.
Login or Register to save!
Download Free PDF

READ FREE ONLINE

  1. ×

    Welcome to OpenBook!

    You're looking at OpenBook, NAP.edu's online reading room since 1999. Based on feedback from you, our users, we've made some improvements that make it easier than ever to read thousands of publications on our website.

    Do you want to take a quick tour of the OpenBook's features?

    No Thanks Take a Tour »
  2. ×

    Show this book's table of contents, where you can jump to any chapter by name.

    « Back Next »
  3. ×

    ...or use these buttons to go back to the previous chapter or skip to the next one.

    « Back Next »
  4. ×

    Jump up to the previous page or down to the next one. Also, you can type in a page number and press Enter to go directly to that page in the book.

    « Back Next »
  5. ×

    To search the entire text of this book, type in your search term here and press Enter.

    « Back Next »
  6. ×

    Share a link to this book page on your preferred social network or via email.

    « Back Next »
  7. ×

    View our suggested citation for this chapter.

    « Back Next »
  8. ×

    Ready to take your reading offline? Click here to buy this book in print or download it as a free PDF, if available.

    « Back Next »
Stay Connected!