National Academies Press: OpenBook
« Previous: CHAPTER SEVEN Conclusions, Effective Practices, and Recommendations for Future Research
Page 73
Suggested Citation:"References." National Academies of Sciences, Engineering, and Medicine. 2012. Expedited Procurement Procedures for Emergency Construction Services. Washington, DC: The National Academies Press. doi: 10.17226/22691.
×
Page 73
Page 74
Suggested Citation:"References." National Academies of Sciences, Engineering, and Medicine. 2012. Expedited Procurement Procedures for Emergency Construction Services. Washington, DC: The National Academies Press. doi: 10.17226/22691.
×
Page 74
Page 75
Suggested Citation:"References." National Academies of Sciences, Engineering, and Medicine. 2012. Expedited Procurement Procedures for Emergency Construction Services. Washington, DC: The National Academies Press. doi: 10.17226/22691.
×
Page 75
Page 76
Suggested Citation:"References." National Academies of Sciences, Engineering, and Medicine. 2012. Expedited Procurement Procedures for Emergency Construction Services. Washington, DC: The National Academies Press. doi: 10.17226/22691.
×
Page 76
Page 77
Suggested Citation:"References." National Academies of Sciences, Engineering, and Medicine. 2012. Expedited Procurement Procedures for Emergency Construction Services. Washington, DC: The National Academies Press. doi: 10.17226/22691.
×
Page 77

Below is the uncorrected machine-read text of this chapter, intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text of each book. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.

73 ABC News, “FEMA Director Removed From Katrina Duty,” ABC News.com, Politics, Sep. 9, 2005. [Online]. Avail- able: http://abcnews.go.com/Politics/HurricaneKatrina/ story?id=1111074&page=1 [accessed Apr. 12, 2012]. Alabama Emergency Management Agency (AEMA), The State of Alabama’s Emergency Operations Plan, AEMA, Clanton, Jan. 2, 2009, 410 pp. Alaska Department of Transportation and Public Facilities (ADOT&PF), Alaska Field Operations Guide, Publica- tion 132, ADOT&PF, Juneau, Jan. 2005. Alder, R., “UDOT Construction Manager General Contract (CMGC) Annual Report,” Utah Department of Transpor- tation Project Development Group, Engineering Services and Bridge Design Section, Salt Lake City, 2007, 39 pp. American Bar Association (ABA), Model Procurement Code for State and Local Governments, ABA House of Delegates, Washington, D.C., 2000, 7 pp. Anderson, S.D. and J.S. Russell, NCHRP Report 451: Guide- lines for Warranty, Multi-Parameter, and Best Value Contracting, Transportation Research Board, National Research Council, Washington, D.C., 2001, 101 pp. Anderson, S.D. and I. Damnjanovic, NCHRP Synthesis 379: Selection and Evaluation of Alternative Contracting Methods to Accelerate Project Completion, Transporta- tion Research Board of the National Academies, Wash- ington, D.C., 2008, 77 pp. Apke, G., ODOT Emergency and Urgency Maintenance of Cut or Fill Slope Failures User’s Guide, Oregon DOT, Salem, Apr. 2002, p. 7. Arizona Department of Transportation (ADOT), Design- Build Procurement & Administration Policy, Arizona Department of Transportation, Phoenix, 2007. Associated General Contractors of Iowa (AGCI), “Public Bidding in Iowa,” AGCI, Des Moines, 2012 [Online]. Available: http://www.agcia.org/iowaPublicBidding.asp [accessed Apr.12, 2012]. Bai, Y., W.R. Burkett, and P.T. Nash, “Lessons Learned from an Emergency Bridge Replacement Project,” Journal of Construction Engineering and Management, ACSE, Vol. 341, 2006, pp. 338–344. Blakemore, F.P and T.F. Konda, “Design–Build Replace- ment of US-90 Bridge over Bay St. Louis, Mississippi, Transportation Research Record: Journal of the Trans- portation Research Board, No. 2201, Transportation Research Board of the National Academies, Washington, D.C., 2010, pp. 106–112. Blanchard, B., “Design-Build Lessons Learned Florida DOT,” Proceedings, Louisiana Transportation Engineer- ing Conference, Baton Rouge, Feb. 2007, pp. 6–14. Blanchard, B.A., T.R. Bohuslav, C. Schneider, S. Anderson, C.J. Schexnayder, S. DeWitt, G. Raymond, and R. Shef- field, Best Practices in Accelerated Construction Tech- niques, NCHRP20-68A Domestic Scan Report 07-02, Transportation Research Board of the National Acade- mies, Washington, D.C., 2009, 192 pp. Brick T., “Proper Prior Planning Prevents Pitifully Poor Perfor- mance,” Print News Today, Oct. 2005 [Online] Available: http://www.af.mil/news/story_print.asp?id=123012084 [accessed Apr. 22, 2012]. Burati, J.L., J.J. Farrington, and W.B. Ledbetter, “Causes of Quality Deviations in Design and Construction,” Journal of Construction Engineering and Management, Vol. 118, No. 1, 1992, pp. 34–49. Byrd, L.G. and A.A. Grant, “Prerequisites for a Successful Design/Build/Warranty Highway Construction Con- tract,” A Report to the U.S. Department of Transporta- tion, Federal Highway Administration, Washington, D.C., Mar. 1993 [Online]. Available: http://www.fhwa. dot.gov/programadmin/contracts/byrd.cfm [accessed Feb. 4, 2012]. California Department of Transportation (Caltrans), Con- struction Manual, Chapter 5-5 Emergency Contract Administration, Caltrans, Sacramento, 2006. California Department of Transportation (Caltrans), “Administration of Emergency Force Account and Lim- ited Bid Contracts,” Construction Policy Bulletin CPB 10-3, Caltrans, Sacramento, Apr. 7, 2010, pp. 1–3. Carpenter, J., “WSDOT Design-build Project Delivery Guidance Statement: Alternative Technical Concepts,” Washington State DOT, Olympia, Apr. 10, 2010, 15 pp. Christensen M.R. and L.E. Meeker, “Design/Build Proj- ects—Lessons Learned from the Contractor’s Perspec- tive,” Proceedings, American Railway Engineering and Maintenance-of-Way Association, Lanham, Md., 2002, 22 pp. Design-Build Institute of America (DBIA), Design-Build Manual of Practice, Design-Build Institute of America, Washington, D.C., 2009, pp. 6–35. Diekmann, J.E. and M.C. Nelson, “Construction Claims: Frequency and Severity,” Journal of Construction Engi- neering and Management, Vol. 111, No. 1, 1985, pp. 74–81. REFERENCES

74 Federal Emergency Management Agency (FEMA), “About FEMA,” 2012 [Online]. Available: http://www.fema. gov/about/ [accessed Mar. 15, 2012]. Federal Highway Administration (FHWA), “SEP-14 Active Project List,” 2011 [Online]. Available: http://www. fhwa.dot.gov/programadmin/contracts/sep14list.cfm [accessed Dec. 2, 2011]. Federal Highway Administration (FHWA), “Glossary of Award Types,” 2010 [Online]. Available: http://www. fhwa.dot.gov/aaa/glossary.htm [accessed Apr. 20, 2012]. Fellows, R. and A. Liu, Research Methods for Construction, 3rd ed., Wiley–Blackwell, Boston, Mass., 2008. Flatiron, Inc., “Florida’s New I-10 Bridge Opens to Traffic,” Jan. 4, 2007 [Online]. Available: http://www.flatiron- corp.com/index.asp?w=pages&r=9&pid=42&n=26 [accessed Apr. 12, 2012]. Florida Department of Transportation (FDOT), Project Management Handbook, Chapter 18—Emergency Con- tracting, FDOT, Tallahassee, 2010, p. 134. Florida State Government, Florida Senate, Ch. 252.38, Emergency Management Powers of Political Subdivi- sions, 2010 [Online]. Available: http://archive.flsenate. gov / s t a t u t e s / i ndex .cf m?App_ mode = Display_ Statute&Search_String=&URL=0200-0299/0252/Sec- tions/0252.38.html [accessed Mar. 14, 2012]. Gilson, M., State of Alaska Department of Law, Memoran- dum: Succession to the Office of the Governor in Relation to Certain Disaster Management Issues, State of Alaska, Juneau, Alaska, 1997. Gonderinger, C., “TH 14/218 Design-Build Project Techni- cal Memorandum Quality Management Plan (QC/QA Requirements),” Minnesota Department of Transporta- tion Technical Memorandum, St. Paul, 2001, pp. 1–17. General Accounting Office (GAO). Using Structured Inter- viewing Techniques, GAO/PEMD-10.1.5, General Accounting Office, Washington, D.C., June 1991, 191 pp. Gransberg, D.D., C. Lopez del Puerto, and D. Humphrey, “Relating Cost Growth from the Initial Estimate Versus Design Fee for Transportation Projects,” Journal of Con- struction Engineering and Management, ASCE, Vol. 133, No. 6, June 2007, pp. 404–408. Gransberg, D.D. and K.R. Molenaar, “Analysis of Owner’s Design and Construction Quality Management Approaches in Design-Build Projects,” Journal of Man- agement in Engineering, ASCE, Vol. 20, No. 4, Oct. 2004, pp. 162–169. Gransberg, D.D. and C. Riemer, “Impact of Inaccurate Engi- neer’s Estimated Quantities on Unit Price Contracts,” Journal of Construction Engineering and Management, ASCE, Vol. 135, No. 11, Nov. 2009, pp. 1138–1145. Gransberg, D.D. and J.S. Shane, NCHRP Synthesis 420: Con- struction Manager-at-Risk Project Delivery for Highway Programs, Transportation Research Board of the National Academies, Washington, D.C., 2010, pp. 96–97. Hancher, D., NCHRP Synthesis of Highway Practice 195: Use of Warranties in Road Construction, Transportation Research Board, National Research Council, Washing- ton, D.C., 1994. Hietpas, J., “I-35W St. Anthony Falls Bridge: Planning the Replacement,” Aspire, Fall 2008, pp. 24–27. Houston, N., “Emergency Procurement—When Is an Emer- gency Really an Emergency?” Coates’ Canons: NC Local Government Law Blog, June 7, 2011 [Online]. Available: http://sogweb.sog.unc.edu/blogs/localgovt/?p=4717 [accessed Apr. 12, 2012]. Jeffrey, J.T. and C.L. Menches, “Emergency Contracting Strategies for Federal Projects,” Journal of Professional Issues in Engineering Issues in Education and Practice, Vol. 134, No. 4, Oct. 2008, pp. 371–379. Kirby, J.G., D.A. Furry, and D.K. Hiks, “Improvements in Design Review Management,” Journal of Construction Engineering and Management, Vol. 114, No. 1, 1988, pp. 69–82. Kirk, R.S., “Emergency Relief Program: Federal-Aid High- way Assistance for Disaster-Damaged Roads and Bridges,” Congressional Research Service Report for Congress 7-5700 R4202.1, Sep. 23, 2011, 11 pp. Koch, J.E., D.D. Gransberg, and K.R. Molenaar, Project Administration for Design-Build: A Primer for Owners, Engineers, and Contractors, ASCE Press, Reston, Va., 2010, 286 pp. KTLA News, “Caltrans Closes 60 Fwy. Lanes to Demolish Damaged Overpass,” Feb. 27, 2012 [Online]. Available: http://www.ktla.com/news/landing/ktla-60-fwy-tanker- explosion,0,7111758,full.story. Lo, H.K., “Organizing for Intelligent Transportation Sys- tems Case Study of Emergency Operations in San Fran- cisco Bay Area,” Transportation Research Record 1603, Transportation Research Board, National Research Council, Washington, D.C., 1997, p. 34–40. Loosemore, M. and K. Hughes, “Emergency Systems in Con- struction Contracts,” Engineering, Construction and Archi- tectural Management, Vol. 5, No. 2, 1998, pp. 189–198. Louisiana Office of State Purchasing (LOSP), Helpful Infor- mation about Louisiana Emergency Procurement, LOSP, Baton Rouge, Mar. 2011, pp. 2–5. Maine Department of Transportation (Maine DOT), Request for Proposals, Design-Build Services for Memorial Bridge Replacement Project, Maine DOT, Montpelier, 2011, p. 57.

75 Maxey, D., “Emergency Repair of the I-10 Bridge Over Escambia Bay,” FICE/FDOT Design Conference, Orlando, Fla., Aug. 2006, 43 pp. McLain, K.W., “Design-Build Procurement Process for Slope Repairs and Slope Stabilization Projects for Road- ways on the Missouri State System,” Master’s Thesis, Iowa State University, Ames, 2008, 66 pp. McLain, K.W. and J.S. Shane, “A Case for Design-Build with the Missouri Department of Transportation,” Kansas City Business Journal, Supplement, Design Build Insti- tute of America, Washington, D.C., 2009, 4 pp. McMinimee, J.C., “CMGC Project Delivery,” Presentation, FHWA Every Day Counts Summit Conference, Minne- apolis, Minn., Oct. 2010, 77 pp. Migliaccio, G.C., S.M. Bogus, and A. Chen, “Effect of Dura- tion of Design–Build Procurement on Performance of Transportation Projects,” Transportation Research Record: Journal of the Transportation Research Board, No. 2151, Transportation Research Board of the National Academies, Washington, D.C., 2010, pp. 67–73. Migliaccio, G.C., G.E. Gibson, and J.T. O’Connor, “Chang- ing Project Delivery Strategy, an Implementation Frame- work,” Public Works Management & Policy, Vol. 12, No. 3, 2008, pp. 483–502. Minnesota Department of Transportation (MnDOT), “I-35W Streamlining for Emergency Relief Program Pro- visions,” Unpublished working paper, MnDOT, St. Paul, Dec. 2008, pp. 1–2. Minnesota Department of Transportation (MnDOT), “Force Account,” St. Paul, 2011 [Online]. Available: http:// www.dot.state.mn.us/const/tools/forceaccount.html, [accessed Apr. 20, 2012]. Molenaar, K.R. and A.D. Songer, “Model for Public Sector Design-Build Project Selection,” Journal of Construction Engineering and Management, ASCE, Vol. 124, No. 6, 1998, pp. 467–479. Molenaar, K.R., N. Sobin, D.D. Gransberg, T.L. McCuen, S. Korkmaz, M. Horman, and D. Riley, “Sustainable, High Performance Projects and Project Delivery Methods: A State-of the Practice Report,” White paper, Charles Pan- kow Foundation, Ontario, Calif., 2009, 30 pp. Molenaar, K., D. Gransberg, and D. Sillars, “Alternative Quality Management Systems for Highway Construc- tion.” NCHRP 10-83, Transportation Research Board of the National Academies, Washington, D.C., 2011, p. 146. Montana Department of Transportation (MDT), Design-Build Request for Proposal US 2—Rockfall Mitigation, Flathead County, Project # SFCN 1-2(169)154, Montana Department of Transportation, Helena, Mar. 25, 2011, 39 pp. Mogren, E.T., Claims by the Federal Government Against its A/E—Guidelines for Improving Practice, Office for Pro- fessional Liability Research, Victor O. Schinner and Co., Washington, D.C., 1996. National Society of Professional Engineers (NSPE), “Design/Build in the Public Sector,” NSPE Board of Directors, Position Statement #1726, 1995 [Online] Available; http://www.nspe.org/govrel/gr2-ps1726.asp [accessed Nov. 17, 2011]. Neuendorf, K.A., The Content Analysis Guidebook, Sage Publications, Thousand Oaks, Calif., 2002, 300 pp. New Mexico Department of Transportation (NMDOT), New Mexico Department of Transportation Internal Pro- cedures Manual, Section L—Emergency Purchase, NMDOT, Santa Fe, 2007, p. 124. New York State Department of Transportation (NYSDOT), “Statewide Emergency Bridge Contract: Guidance,” NYSDOT Engineering Instruction EI 07-012, NYSDOT, Albany, 2007, pp. 1–3. Oklahoma Department of Transportation, Oklahoma Department of Transportation Special Provisions for E-SAP-105N(162), J/P 25007(04), Beckham County, Oklahoma Department of Transportation, Oklahoma City, Okla., Sep. 4, 2007. Oklahoma Department of Transportation, “Emergency Bridge Repair Project to Be Let June 18, 2010, Logan County,” Invitation for Bids, Oklahoma Department of Transportation, Oklahoma City, Okla., June 16, 2010. Oppenheim, A.N., Questionnaire Design, Interviewing and Attitude Measurement, Continuum, London, U.K., 1992. Oregon Department of Transportation (ODOT) “ODOT Two-Tiered Selection & Work Assignment Procedure For Personal Services Contracts for Local Agency A&E Ser- vices,” ODOT Policy Administration 28347 thru 28356, Salem, Sep. 8, 2010, pp. 1–5. Oregon Department of Transportation (ODOT) Mainte- nance Guide—Section 180 Emergency Maintenance, ODOT, Salem, Oct. 2004, pp. 180-1 to 180-2. Parvin, C., “Design-build: Evaluation and Award,” Roads and Bridges, Vol. 38, No. 12, 2000, p. 12. Pennsylvania Department of Transportation (PennDOT), Innovative Bidding Toolkit, PennDOT Publication 448, Bureau of Project Delivery, Harrisburg, 2011, 197 pp. Perry, J.L. and M.L. Hines, NCHRP Legal Research Digest 49: Emergency Contracting: Flexibilities in Contracting Procedures During an Emergency, Transportation Research Board of the National Academies, Washington, D.C., 2007, pp. 3–25.

76 Primer on Contracting for the Twenty-first Century, 5th ed., American Association of State Highway and Transporta- tion Officials, Washington, D.C., 2006 [Online]. Avail- able: www.transportation.org/sites/construction/docs/ Primer%20on%20Contracting%202006.pdf [accessed May 25, 2012]. Pulver, B., “Maine DOT Accelerated CMGC,” FHWA 2012 CMGC Peer Exchange, Boston, Mass., May 2012, 35 pp. Schexnayder, C.J. and R. Mayo, Construction Management Fundamentals, McGraw-Hill Professional, New York, N.Y., 2004, pp. 282–283. Schexnayder, C. and S.M. Anderson, “Emergency Acceler- ated Construction,” Proceedings, Construction Research Congress, Innovation for Reshaping Construction Prac- tice, Banff, Alberta, Canada, May 8–10, 2010, pp. 837–848. Schierholz, J., D.D. Gransberg, and J. McMinimee, “Bene- fits and Challenges of Implementing Construction Man- ager/General Contractor Project Delivery: The View from the Field,” TRB 91st Annual Meeting Compendium of Papers, DVD, Paper #12-1206, Washington, D.C., Jan. 22–26, 2012. Schofield Construction Law, “Construction Contract Termi- nology,” 2012 [Online]. Available: http://www.contract- laws.com/terminology.html [accessed May 25, 2012]. Science Applications International Corporation (SAIC), NCHRP Web Document 59: Outsourcing of State DOT Capital Program Delivery Functions, Final Report, Nov. 2003 [Online]. Available: http://onlinepubs.trb.org/ onlinepubs/nchrp/nchrp_w59.pdf [accessed Apr. 9, 2012]. Scott, S., K.R Molenaar, D.D. Gransberg, and N. Smith, NCHRP Report 561: Best Value Procurement for High- way Construction Projects, Transportation Research Board of the National Academies, Washington, D.C., Sep. 2006. Scott, S., T. Ferragut, M. Syrnick, and S.D. Anderson, NCHRP Report 699: Guidelines for the Use of Pavement Warranties on Highway Construction Projects, Trans- portation Research Board of the National Academies, Washington, D.C., 2011, 64 pp. Sechrist, R., E. Westhuis, and D. Kenneally, “Hurricane Irene, Tropical Storm Lee, Preparation, Response and Recovery,” Proceedings 17th Statewide Conference on Local Bridges, Syracuse, N.Y., Oct. 26, 2011 [Online]. Available: https://www.dot.ny.gov/divisions/engineer- ing/structures/events-news/2011/presentations [accessed Apr. 9, 2012]. Shane, J.S., D.D. Gransberg, K.R. Molenaar, and J.R. Gladke, “Legal Challenge to a Best-Value Procurement System,” Journal of Leadership and Management in Engineering, ASCE, Vol. 5, No. 1, Jan. 2006, pp. 1–6. Shane, J.S., K. Strong, and D.D. Gransberg, Draft Guide- book for Managing Complex Projects, Transportation Research Board of the National Academies, Washington, D.C., July 2011, 130 pp. Shields, M.D., Glossary of Federal Acquisition Terms, Fed- eral Acquisition Institute, Washington, D.C., December 1998, 121 pp. State of Minnesota, Glossary of Common Procurement Terms, Department of Administration, Materials Man- agement Division, St. Paul, 2011 [Online]. Available: http://www.mmd.admin.state.mn.us/mn06008.htm. Thorn, T., “Orleans Ave. Project Achieves On-Time Com- pletion,” Kieways, July 2006, p. 9. Touran, A., D.D. Gransberg, K.R. Molenaar, K. Ghavamifar, and P. Bakhshi, ACRP Report 21: A Guidebook for Select- ing Airport Capital Project Delivery Methods, Transpor- tation Research Board of the National Academies, Washington, D.C., 2009, 90 pp. Touran, A., D.D. Gransberg, K. R. Molenaar, and K. Gha- vamifar, “A Decision Support System for Project Delivery Method Selection in Transit,” Transportation Research Record: Journal of the Transportation Research Board, No. 2111, Transportation Research Board of the National Academies, Washington, D.C., 2010, pp. 148–157. Trauner Consulting Services, Innovative Procurement Prac- tices Alternative Procurement and Contracting Methods, California Department of Transportation Report No. 53A0104, Sacramento, 2007, pp. 10–12. USLegal, “Letter Contract Law and Legal Definitions,” 2012 [Online] Available: http://definitions.uslegal.com/l/let- ter-contract/ [accessed Apr. 20, 2012]. United States Code (USC), Title 23 USC- Highways, As Amended Through Public Law 106-347, Oct. 13, 2000, 213 pp. [Online]. Available: http://epw.senate.gov/title23. pdf [accessed Mar. 20, 2012]. United States Code (USC) “Robert T. Stafford Disaster Relief and Emergency Assistance Act,” Public Law 93-288, as amended, 42 U.S.C. 5121-5207, and Related Authorities, United States Code Title 42. The Public Health and Wel- fare, Chapter 68. Disaster Relief, June 2007, 125 pp. U.S. Army Corps of Engineers (USACE), MILCON Trans- formation Model RFP, Department of the Army, Wash- ington, D.C., 2007 [Online]. Available: ftp://ftp.usace. army.mil/pub/hqusace/MILCON%20TRANSFORMA- TION/ [accessed Apr. 14, 2007]. Utah Department of Transportation (UDOT), Emergency Contracting/Procurement Procedure, UDOT, Salt Lake City, 2011a, pp. 1–34. Utah Department of Transportation (UDOT), Request for Streamlined Proposal Construction Management/Gen-

77 eral Contractor (CMGC) Services, Project No. F-0014(34)6, SR-14; Landslide Emergency Repair, UDOT, Salt Lake City, Nov. 21, 2011b, 32 pp. Vermont Agency of Transportation (VTrans), Policy Man- ual; Subject: Disaster Management Response and Recov- ery, VTrans, Montpelier, June 13, 2011, pp. 1–2. Warne, T., “The St. Anthony Falls Bridge Project, Success- ful for Many Reasons: Lessons Learned,” Tom Warne and Associates Report for the Minnesota Department of Transportation, St. Paul, Dec. 8, 2008, 26 pp. Washington State Department of Transportation (WSDOT), Guidebook for Design-build Highway Project Develop- ment, WSDOT, Olympia, 2004, 109 pp. Washington State Department of Transportation (WSDOT), Emergency Relief Procedures Manual (M 3014.03), Maintenance Operations Division, WSDOT, Olympia, 2012. West, N.J.N., D.D. Gransberg, and J. McMinimee, “Effec- tive Tools for Projects Delivered Using the Construction Manager/General Contractor,” TRB 91st Annual Meet- ing Compendium of Papers, DVD, Washington, D.C., Jan. 22–26, 2012. Ziegler, F.G., North Dakota Department of Transportation, Emergency Relief Manual, Procedures for Administering Emergency Relief Funds, Draft, Bismarck, 2011.

Next: Glossary »
Expedited Procurement Procedures for Emergency Construction Services Get This Book
×
 Expedited Procurement Procedures for Emergency Construction Services
MyNAP members save 10% online.
Login or Register to save!
Download Free PDF

TRB’s National Cooperative Highway Research Program (NCHRP) Synthesis 438: Expedited Procurement Procedures for Emergency Construction Services explores procurement procedures being utilized by state departments of transportation in coordination with federal agencies to repair and reopen roadways in emergency situations.

READ FREE ONLINE

  1. ×

    Welcome to OpenBook!

    You're looking at OpenBook, NAP.edu's online reading room since 1999. Based on feedback from you, our users, we've made some improvements that make it easier than ever to read thousands of publications on our website.

    Do you want to take a quick tour of the OpenBook's features?

    No Thanks Take a Tour »
  2. ×

    Show this book's table of contents, where you can jump to any chapter by name.

    « Back Next »
  3. ×

    ...or use these buttons to go back to the previous chapter or skip to the next one.

    « Back Next »
  4. ×

    Jump up to the previous page or down to the next one. Also, you can type in a page number and press Enter to go directly to that page in the book.

    « Back Next »
  5. ×

    To search the entire text of this book, type in your search term here and press Enter.

    « Back Next »
  6. ×

    Share a link to this book page on your preferred social network or via email.

    « Back Next »
  7. ×

    View our suggested citation for this chapter.

    « Back Next »
  8. ×

    Ready to take your reading offline? Click here to buy this book in print or download it as a free PDF, if available.

    « Back Next »
Stay Connected!