Below is the uncorrected machine-read text of this chapter, intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text of each book. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.
F-1 APPENDIX F MINNESOTA DOT PEER EXCHANGE AGENDA
F-2 Minnesota Cost Estimating Peer Exchange Best Western Maplewood Inn, Maplewood, Minnesota September 26 and 27, 2005 Noon Lunch provided, Best Western Dining Room 1:00 â 1:15 Introduction Mn/DOT & TTI 1:15 â 3:00 Presentations and Perspectives Cost Estimation and Cost Estimation Management Bob Winter, Division Director, District Operations Division Tom Sorel, FHWA Victor Barbour, P.E- Construction Unit North Carolina DOT Daryl Greer, P.E Transportation Engineering Branch Manager Kentucky DOT 3:00 â 3:15 Break 3:15 â 4:15 Presentations and Perspectives Cost Estimation and Cost Estimation Management Jack Young Structure Office Engineer/Division of Engineering Services CALTRANS Sio Ng, P.E, Cost Risk Estimating Engineer Washing State DOT 4:15 â 5:00 Wrap-Up/Prep for Day 2 Mn/DOT & TTI AGENDA â Day 1
F-3 AGENDA â DAY 2 8:00 â 9:50 National Cooperative Highway Research Program 8-49 Introduction and Agency Overview Stuart Anderson, TTI Strategies, Methods, and Tools Keith Molenaar, TTI 9:50 â 10:00 Break 10:00 â 11:30 Concurrent sessions: Planning - Keith Molenaar, University of Colorado, Section A Final Design--Cliff Schexnayder, Arizona State University Section B Programming and Preliminary Design, Stuart Anderson, TTI, Section C 11:30 â 12:15 Lunch 12:15 â 1:30 Concurrent sessions continued - return to sessions 1:30 â 1:45 Break 1:45 â 2:45 MnDOT response to presentations/small groups 2:45 â 3:00 Break (need to open room back up again) 3:00 - 3:30 General Session â small groups report back 3:30 â 4:15 NCHRP Researchers and DOT Panelists respond 4:15 â 4:30 Wrap Up Evaluation Mn/DOT & TTI