Below is the uncorrected machine-read text of this chapter, intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text of each book. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.
67 APPENDIX C Sample Checklist for Inspection of Risk Control Actions Source: ASM Consultants. Sample Checklist for Inspecon of Risk Controls Project: Airfield excavation to replace runway lighting system Location: Area adjacent to RWY 04/22 safety area Date: 9/7/2015 Risk Control Yes No N/A Freq. Comments 1 â Is the unserviceable area clearly marked, lighted and signed? â¡ â¡ 2 â Are existing utilities clearly marked to avoid damage during excavations? â¡ â¡ 1/day Reported to Contractor (name), correction before end of day 3 â Is construction equipment below maximum height authorized? â¡ â¡ 4 â Is FOD being generated to active (movement and non-movement) airfield areas â¡ â¡ 5 â Is there a valid NOTAM reporting the closure of the airfield area â¡ â¡ 6 â Are workers eating while in the construction zone? â¡ â¡ 7 â Has ARFF been informed about changes to emergency routes? â¡ â¡ 8 â Are speed limits being followed by construction vehicles? ⡠⡠⦠Notes: Contractor: (name, position, organization) Airport: (name, position)