Below is the uncorrected machine-read text of this chapter, intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text of each book. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.
 Backgr A 20âques distribute planning a firms, and field of ex the respo the survey âothersâ i authoritie The follow Stakeh Does you More tha 32 percen that othe RAI ound tion survey w d to more th nd economi  universities. pertise. We r ndents repre . Every stake ncluded: por s, regional pl ing survey re older Res r state have a n 25 percent t of the resp r transportat L FUN as prepared an 500 stakeh c developme  Each stakeh eceived 112 sented a stat holder group t authorities, an commissio sponses high ponse  rail funding of the respon ondents nam ion funding p DING  to identify ra olders, repre nt agencies, f older group r responses  re e transportat  responded t  railroad asso ns, railroad light rail fun  program(s)? dents were ed programs rograms are  TRE il funding tre senting fede reight and pa eceived com presenting a ion agency.  o the survey ciations, rail customers, a ding trends a  unaware of ra  for which ra recognizing m NDS nds and obje ral and state ssenger rail mon and uni  21% respon Every state e . Responden road advocac nd several tr nd objective il funding pr il is an eligibl ultimodal o AND ctives. This s  transportati operators, fin que question se rate. Forty xcept Hawai ts who were y groups, cou ansportation s. ograms with e expenditure bjectives.  OBJE 6 urvey was on agencies, ancial servic s related to t âfive percent i participated identified as nty rail tran  consultants. in their state . This illustra CTIV state es heir  of  in sit . Yet tes ES
  Does you  Without a award a g than 5 pe offered at available How muc Three stat awarded $ How is yo Response Annual ap Sales tax Fuel tax o Dedicated  Other sta Clean Air Departme State Infra Communi Freight M Connect O  r state rail pr  funding sou rant than a lo rcent of the l  a discounted for project pl h state rail p es awarded 2â$3 million ur state rail s included: propriation f  n Class 1 railr  State fundin te funding pr Programs (CM nt of Comme structure Ba ty Block Gran obility Strate regon ogram award rce it is hard an especially oans provide  rate. In gen anning. rogram fund more than $2  a year, based program fund rom General   oads  g  ograms for w AQ)  rce  nk  ts  gic Investme    loans or gra to sustain a l  to short line d by states h eral, most pr ing is awarde 5 million per  upon surve ed?  Fund hich rail is e nt Board nts? oan or grant  railroads du ave loan forg ograms are f d on an ann  year to rail p y response.  Pay a  Mot  Mult  Fede ligible includ  Econ  Jobs  Ente  Rura  EPA  Road program. In m e to docume iveness prov or constructi ual basis? rojects. The s you go sta or fuel tax imodal funds ral discretion ed: omic Develo  programs rprise Bond l Economic D and DRA Gra work Develo  any cases, i ntation requ isions. Most s on, few loans average state te and federa  ary grants pment Funds evelopment nts pment (Grad 7 t is easier to irements. Les tate loans ar  or grants are  rail program l funds  Grants e Crossing) s e   Â
Please ran Responde most imp indicates Rail fundi Are there of railroad Fiftyâseve to state ra k the follow nts indicated ortant object rail is seen as ng to reduce  any legal or s? n percent of il ownership ing rail progr  that rail exp ive. Rail pres  an importan highway con regulatory re the responde , investment am funding ansion to sup ervation rank t economic d gestion was r strictions w nts indicated or operation objectives in port jobs an ed third in im evelopment anked as the hich apply to  that there w  of railroads.  order of imp d improve ec portance. R tool to creat  least import  state owner ere no statu Some state s ortance. onomic deve esponse to th e jobs and bo ant objective ship, investm tory or regul tatutes proh 8 lopment was is question ost the econ . ent or oper atory restrict ibit state  the omy. ation ionsÂ
  acquisitio state own restriction What do Industrial projects s Are there Typical an Funding C ï· Fu 20 ï· M ï· Fu Ef Program ï· R ân ï· R w ï· A te ï· M n or ownersh ership positi s which proh state investm rail access, s upported by  any rail prog swers fell int omments: nding needs  years. Secti ore funding nding is nee ficiency (CRE Limitation C ail is one of fi eedâ based ailroad Rehab hich is a hurd  general lack rm projects, andated PTC ip of private on in a projec ibit the own ents suppor afety program state rail fun rams which o two catego  to be increa on 130 funds for industrial ded to comp ATE), Rail Fre omments: ve modes eli infrastructure ilitation and le many app of flexibility i incentivize p  improvemen rail assets. M t. Some state ership of railr t? s, rail prese ding program could be imp ries: amount sed for state  are inadequ  rail service f lete projects ight Program gible for the  funding.  Improvemen licants canno n funding sou rivate investm ts cannot se ost states do s allow state oad rolling st rvation, and s. roved? If so  of funding a owned rail cr ate for crossi und. like Chicago s and HighâS nonâhighway t Financing ( t overcome. rces often m ent or PPPs cure comme  not conside  rail ownersh ock. passenger ra what would nd program l ossings, fund ng protection Regional Env peed Rail (HS  grant progra RRIF) loans h akes it diffic  (Public Priva rcial funding. r the award o ip, but have  il projects are you recomm imitations. ing levels ha .  ironmental a R) Programs m â rail has c ave a credit r ult to strateg te Partnersh  9 f rail grants  specific  the typical end? ve not chang nd Transport . ompeted we isk premium ically fund lo ips). as a ed in ation ll for  ngâ
10Â ï· With sufficient funding, more rail programs could be converted to forgivable loans (a forgivable loan can be treated as a grant if volume commitments are met) based upon performance. ï· Performance measurement criteria are needed for forgivable loan programs. What are the essential program elements of Innovative Funding?  Stakeholders identified three elements essential to attractive innovative funding programs. Processing time, program flexibility and desirable program elements were topics of greatest interest.  Time to Acquire Funds ï· Economic review processes for grants which require a cost benefit analysis are desirable. ï· Funding processes need to be streamlined to provide quick access to funds. ï· Federal funds are needed that permit expedited construction. Flexibility ï· Flexibility is essential. Funding for transportation infrastructure is often segmented by mode which limits mode eligibility. ï· A more robust embrace of multimodal funding in needed. ï· Tax credits for investment in infrastructure are needed for rolling stock and locomotives. ï· A dedicated source of funding at the state and federal level is needed, insulated from economic ups and downs, and not dependent upon congressional budget approval. ï· A relaxed restriction for highway funds is needed to allow for multimodal investments. ï· Flexibility is necessary for freight and passenger programs with no restriction of size, scale or cost of project. ï· The ability to capture positive externalities is very important. ï· Maximum flexibility is needed at the state level due to the multimodal nature of projects. Desired Program Elements ï· Public Private Partnerships may provide a better vision for the future. ï· Grants with match requirements insure better projects. ï· The grant application process must be competitive. ï· Grants seem to produce better results than loan programs. ï· Stakeholder and political support is very important for the success of innovative programs.
  Does you  Stakehold state prio question separately State prog represent r state have r ers reported rities may no because of th  for funding. ram for pub  a multiâstate ail programs  that multiâst t have the sa e network si  Another mu licly owned ra  benefit.   that extend ate freight ra me emphasis ze. States com ltiâstate prog il cars. These  beyond stat il operations . Amtrak ope mented tha ram example  cars can tec e borders?  are difficult rations were t each state w  brought fort hnically oper  to fund beca  most comm as required h was the un ate in other 11 use individua only noted in  to negotiate ique Washin states and  l  this  gtonÂ
Stakehold rail progr The respo user to id objectives Summa The surve passenge ï· R ï· P ï· R ï· Po ï· St ï· C ers were ask am national nse to this q entify criteria  as well as pr ry y responses a r and freight ail investmen rograms mus ail Infrastruct or rail infras ate rail prog urrent state p ed to identif database.  uestion illustr  to match th ogram struct re not statis rail programs ts are expens t be flexible d ure is viewed tructure imp rams are des rograms prim y searchable ates a strong e intended pr ure.  Interest tically valid, b  at the state ive and have ue to the mu  as a building acts safety an igned for pro arily suppor  criteria for a  desire for a oject. A sear  was greates ut do provid and federal l  a long life cy ltimodal asp  block to a s d regional e jects within t t safety and  federal and flexible searc ch tool will n t in freight fu e insights ab evel. Key find cle. ect of most r trong econom conomic com he stateâs jur industrial acc  state passen h tool which eed to be sen nding progra out the curre ings include: ail projects. y and job gr petitiveness isdiction. ess projects. 12 ger and freig  will allow th sitive to pro ms.  nt state of  owth. .   ht e jectÂ